Similar Projects
Reported | 01/06/2021 12:00 AM |
Project Title | Competition and Therapy Pool Resurfacing |
Physical Address | View project details and contacts |
City, State (County) | Statesboro, GA 30461 (Bulloch County) |
Category(s) | Entertainment/Recreation |
Sub-Category(s) | Swimming Pool(s) |
Contracting Method | Competitive Bids. |
Project Status | Bidding |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Resurfacing of the interior pool area of the competition pool and the therapy pool at Splash in the Boro Waterpark located at 1388 Hwy. 24 East, Statesboro, Georgia 30461. 1. The County will drain the pools and remove all lane lines, hand rails, chair lifts, etc. 2. Installation of all material and workmanship shall be per the manufacturer’s specifications. 3. Cover all drains, inlets, and skimmers to prevent any and all debris from entering pool piping during the duration of work. 4. Contractor is responsible for removal and proper disposal of all construction debris from jobsite. 5. Sound test both pools for any delaminated plaster. 6. Sand blast all paint from the existing pool surface (Therapy Pool only). 7. Acid wash entire surface area to insure proper bonding of new material. 8. Prepare pool surface for new plaster by sawing and chipping around all fittings and lights. 9. V-cut all cracks back by saw cutting to structural soundness and repair with epoxy or other approved sealer. 10. Repair all delaminated/worn plaster. 11. Repair any hollow or damaged areas in the pool shell. 12. Repair all expansion joints, removing existing caulking material, backer rod and all tile, reinstall new backer rod, caulking, and marking tile. 13. Scarify the entire pool surface and prep for adhesive. 14. Apply Bond Kote adhesive to insure chemical and mechanical bond. 15. Install new Marcite plaster. The finish plaster shall have a smooth and uniform finish. Provide thickness as acceptable to industry standards and to maintain warranty. Install plaster per manufacture’s specifications. 16. Replace all lane tiles, end wall targets tiles, and expansion joint tiles. (Competition Pool only) 17. Replace all water line tiles, depth marker tiles, and marking tile on entry steps. (Therapy Pool only) We are not replacing the lane tiles in the Therapy Pool. 18. Replace all depth marker tiles on the pool deck. Tiles must meet Bulloch County Board of Health standards. 19. All tile colors must match existing colors. 20. The new pool surface shall be fully cured to manufacture’s specifications prior to refilling the pool. Contractor will notify the County when the pool can be refilled. 21. The new pool surface must comply with USA Swimming standards for competition. 22. Refilling of the pools and the chemical balancing of the pools will be completed by the County 23. Provide a 3-year written warranty covering against any plaster delamination. Warranty shall cover both material and labor. |
||||||||||||
Details |
|
||||||||||||
Bidder's List | View project details and contacts | ||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |