Similar Projects
Pitco Frialator Manufacturing Facility, Warehouse, and Offices
New Construction - 356,224 SF
Conception
Concord, NH 03301

Smith Road Storage
New Construction - 6,800 SF
Conception
Merrimack, NH 03054

Contractor Offices and Storage
New Construction - 21,100 SF
Design
Manchester, NH 03109

Moores Crane Rental Storage Building
New Construction, Addition - 7,704 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Dover, NH 03820

Newington
New Construction - 32,710 SF
Bidding
$13,934,080 est. value
Concord, NH

Salt Storage Building
New Construction
Bidding
$300,000 est. value
Freedom, NH 03836

Public Storage #29163
Renovation
Post-Bid
Nashua, NH

Public Storage #24408
Renovation
Post-Bid
Manchester, NH

Storage Warehouse Structure
Results
Manchester, NH 03109

Spaulding High School Field Storage Building
Results
Rochester, NH 03867

Club Motorsports Park - Phase II
New Construction - 11,880 SF
Construction
$8,000,000 to $10,000,000 est. value
Tamworth, NH 03886

Derry Road Warehouse
Addition - 8,250 SF
Construction
Hudson, NH 03051

35 Maple Street Commercial
New Construction
Pending Verification
Derry, NH 03038

Self Storage Facility
New Construction - 57,850 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Merrimack, NH

Equipment Storage Building
New Construction
Post-Bid
$1,100,000 est. value
Bow, NH 03304

Last Updated 06/21/2022 11:48 PM
Project Title

Construct Global Aircrew Strategic Network Terminal Transportable Storage Facility

Physical Address View project details and contacts
City, State (County) Newington, NH   (Rockingham County)
Category(s) Commercial
Sub-Category(s) Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Base Bid: Work generally includes site work and building construction of a 572 SF, single-story steel-framed structure with insulated metal wall and standing seam roof sandwich panels for storage of transportable equipment. Work includes mechanical, electrical, communications infrastructure, and fire alarm systems to support the building. Bid Option (OLI 1): Work includes provision and installation of communications wiring and appurtenances. Construction Schedule 272 days(per specifications) Bid Option (OLI 2):- AC and Energy Controls (Ductless Split Heat Pumps Wiring Refrigeration Lines, DDC, Condenser, etc) Bid Option (OLI 3): Building Security System (Security System Panel, Motion Detector, Magnetic Switch, Key Pad)

Details

Warehouse/Storage, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents