Similar Projects
Stormwater Channel Fencing Upgrades
Alteration
Results
$400,000 est. value
Santa Ana, CA

Cabrillo Park Irrigation Renovation
Renovation, Term Contract, Alteration
Results
$600,000 est. value
Santa Ana, CA

CHP Westminster Security Fence Replacement
Alteration
Post-Bid
Westminster, CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Stormwater Channel Fencing Upgrades
Term Contract
Results
$350,000 est. value
Santa Ana, CA

Chain - Link Fencing and Gate Installation
Alteration
Results
$200,000 est. value
Santa Ana, CA

Thornton Park Baseball Fencing and Fabric
Infrastructure
Results
$89,000 CJ est. value
Santa Ana, CA 92704

CDBG - El Toro Park LodgePole Replacement Project
Infrastructure
Results
$93,485 CJ est. value
Lake Forest, CA 92630

Garden Grove Unified School District (GGUSD) Fencing Project
Infrastructure
Results
$1,082,075 CJ est. value
Santa Ana, CA 92704

Fencing Project #2
Infrastructure
Post-Bid
$400,000 CJ est. value
Garden Grove, CA 92843

Garden Grove Unified School District GGUSD Fencing Project
Infrastructure
Post-Bid
$600,000 CJ est. value
Santa Ana, CA 92704

On Call Installation, Maintenance and Repair Services for Fencing and Gates
Term Contract
Post-Bid
$3,000,000 CJ est. value
Santa Ana, CA 92701

Irvine Valley College Tennis Court Fencing & Dumpster Enclosures
Infrastructure
Results
$24,721 CJ est. value
Irvine, CA 92618

Ponderosa Fencing Project (Rebid)
Infrastructure
Post-Bid
$721,160 CJ est. value
Anaheim, CA 92802

Sonora Elementary School Fence Replacement
Renovation
Post-Bid
$250,000 CJ est. value
Costa Mesa, CA 92626

Last Updated 07/06/2023 04:04 PM
Project Title

MacArthur Fencing Project: Repair and Replacement

Physical Address View project details and contacts
City, State (County) Santa Ana, CA 92707   (Orange County)
Category(s) Single Trades
Sub-Category(s) Fencing
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

1. Description: This bid includes the provision of all labor, materials, and equipment necessary for the installation of approximately 750 linear feet of 8-foot-high, zinc coated then black vinyl coated, (PVC), chain link fencing, including two six-foot swing gates. This project will take place at MacArthur Intermediate School. 1. General Provisions: A. All work must be conducted in a professional manner by trained and competent personnel, following ASTM F567 standards and other regulations of the State, counties, and cities. Unsatisfactory work may result in re-work at the Contractor's expense and potential contract termination. B. The Contractor must possess the appropriate licenses in accordance with California state laws. C. Precautions must be taken to prevent injury or hazards to the Santa Ana Unified School District, minimizing inconvenience to the district. D. Operations must be conducted to avoid damage to the district’s property or adjacent properties. Any damages must be restored at the Contractor's expense to the satisfaction of the district. E. Failure to commence or diligently pursue the work may result in contract termination. F. Special installations must meet the specified workmanship and material quality levels. G. The worksite must be left clean and neat. Failure to do so will require the Contractor to rectify the situation at no extra cost to the district. All removals must be disposed of off-site or delivered to a designated location within the district’s boundaries as directed by the Director of Maintenance and Operations or designee. Installation: A. Items must be plumb, level, accurately fitted, and free from distortion or defects. B. Field welding must adhere to the A WS DI. I. standards. C. Concrete footings. D. Post holes should be dug 6 inches deeper than the bottom of the post. E. All footings will include a 1” crown at the top of concrete to shed water. F. All other posts should be set at 36 inches into the native soil. G. Line posts should not exceed 10 feet on-center and set at a depth of 36 inches.

Details

Division 32 - Exterior Improvements, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents