Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Wastewater Improvement Project
Infrastructure
Design
$70,000 CJ est. value
Pickstown, SD 57367

Custer Wastewater Treatment Facility (WWTF) Improvements - Phase 2 and 3 - Rebid
Renovation, Infrastructure
Bidding
$16,812,503 CJ est. value
Custer, SD 57730

Custer Wastewater Treatment Facility (WWTF) Improvements - Phase 2 and 3 - Rebid
Renovation, Infrastructure
Bidding
$16,812,503 CJ est. value
Custer, SD 57730

Avon Main Street Reconstruction
Post-Bid
Less than $1,500,000 est. value
Avon, SD

Water Department Materials
Post-Bid
Watertown, SD

10th Avenue North Reconstruction
Results
$1,500,000 to $2,500,000 est. value
Watertown, SD 57201

Water Main Replacement 2021
Results
Huron, SD

2022 Bond - Brookings School District
New Construction, Build-out, Infrastructure
Pending Verification
$23,000,000 CJ est. value
Brookings, SD 57006

GA Apron Reconstruction Phase I, Aberdeen Regional Airport
Infrastructure
Pending Verification
$500,000 CJ est. value
Aberdeen, SD 57401

Signing and Delineation - Gravel Roads
Infrastructure
Conception
$1,507,000 est. value
McIntosh, SD

Mill, AC Resurfacing, AC Surfacing
Infrastructure
Design
$4,290,000 CJ est. value
Lake Andes, SD 57356

FB and T Arena and SJM Additions and Renovations - Bid Package 02R
Addition, Demolition, Renovation, Infrastructure
Bidding
$34,961,120 CJ est. value
Brookings, SD 57006

Last Updated 08/18/2022 02:06 PM
Project Title

Mission Sewer Rehabilitation

Physical Address View project details and contacts
City, State (County) Rosebud, SD 57570   (Todd County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $600,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Rosebud Sioux Tribe will accept bids from qualified contractors for the construction of MISSION SEWER on the ROSEBUD INDIAN RESERVATION, TODD COUNTY, SOUTH DAKOTA. The scope of work includes the installation of 1,963 feet of 15 sewer main, 4,033 of 12 sewer main, 1,165 of 8 sewer main, 42 sewer manholes, 466 of 30 Sch 40 Steel micro-tunneling, 7,840 of 8 CIPP sewer main, 17 sewer manhole abandonments, 21 sewer manhole removals, 1 connection to existing lift station, de-watering, silt fence, and sewer service lines. The total contract price will not be increased without prior autho Rosebud rization from the Owner via the change order process. A copy of a valid Contractors license for the state in which the work resides or Certification of Renewal thereof issued and registration of Indian owned firm from TECRO shall be supplied at the time of bidding and enclosed in the required Bidders Bond envelope. In the evaluation of the bids, the Owner may, within funding limitations, give preference up to the amount of five percent above the lowest total bid, to qualified Indian owned firms. The qualified Indian owned firms must register with the local TECRO Office prior to the bid opening. Contractors are advised that state lien laws do not apply on federal trust land. TECRO taxes do apply. The Rosebud Sioux Tribe and Indian Health Service will not allow any contractor/subcontract to commence work until the compliance plan has been approved by the TECRO office and a copy has been provided to the IHS at 400 Soldier Creek Road, Rosebud, SD 57570, (605) 747-0406, ATTN: Erik Anderson, or an emailed pdf of the compliance plan to erik.anderson2@ihs.gov. - Any questions regarding the above should be directed to appropriate offices listed below: TECRO Office Director FX: PO Box 810 Rosebud, SD 57570 PH: 605-747-2322 605-747-2738

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents