Similar Projects
Road 100 and Maple Drive Extension
Infrastructure
Bidding
$850,000 to $950,000 est. value
Pasco, WA

Big Pasco Industrial Center Road 24 Pavement Improvements
Infrastructure
Bidding
$241,000 est. value
Pasco, WA

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Sylvester Street Safety Improvements
Infrastructure
Post-Bid
Pasco, WA 99301

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Pacific Avenue Safety - Midblock Crossing
Alteration
Results
$620,574 est. value

2022 Western Region Pavement Preservation MATOC
Alteration
Post-Bid
$300,000 to $10,000,000 est. value

Burns Pathway Phases 1-3 and North Road 93-Powerline Pathway (Phase 4)
Infrastructure
Results
$467,197 est. value
Pasco, WA 99301

Western Washington University Electrical Engineering & Computer Science Building
Term Contract
Post-Bid

SR 17, SR 260 to Adams County Line - Paving
Infrastructure
Results
$3,000,000 to $4,000,000 est. value
WA

Ls Resurfacing 1
Term Contract
Post-Bid
$997,219,550 est. value

North Industrial Way Storm Water Retrofit and Overlay
Infrastructure
Results
$570,575 est. value
Pasco, WA 99301

I-405, NE 85th Street Interchange and Inline BRT Station Project
Term Contract
Post-Bid
$210,000 est. value

Well Rehabilitation and Water System Improvements Project - 2022
Infrastructure
Results
$350,000 to $400,000 est. value
Kahlotus, WA

Water Main Replacement - Maple Drive AC Main
Infrastructure
Results
$280,000 to $320,000 est. value
Pasco, WA 99301

Last Updated 04/19/2022 05:44 PM
Project Title

Argent Road Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Pasco, WA   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $950,000 to $1,200,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Proposals for the Argent Road Improvements, Phase 2. This project includes all materials equipment and labor for the installation of HMA, planing, curb, gutter, sidewalk, and roadway reconstruction. Construction of pedestrian ramps, pavement markings, storm water utility work, irrigation water main installation, street light installation, new traffic signal equipment, poles, foundations, traffic control, permanent signing and other work.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Precast Concrete.
Division 10 - Specialties, Signage.
Division 26 - Electrical, Exterior Lighting.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures, Electrical Utility Transmission and Distribution, Electrical Utility Poles.
Division 34 - Transportation, Roadway Signaling and Control Equipment, Traffic Signals.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents