Similar Projects
2021 Backflow Testing And Repairs
Alteration
Bidding
Elgin, IL

Barb City Manor Retirement Home - Elevator Modernization
Alteration
Bidding
Less than $650,000 est. value
DeKalb, IL 60115

Pipefitting, Plumbing and Sewer Work
Term Contract
Post-Bid
Chicago, IL

DHS SP - FY21 Plumbing Repair and Maintenance
Term Contract
Post-Bid
$10,000 est. value
Chicago, IL 60601

Various Plumbing Improvements
Results
Winfield, IL 60190

Upgrade HVAC / Plumbing Systems Phase I
Renovation
Results
$2,500,000 to $5,000,000 est. value
Charleston, IL 61920

Repair Plumbing, Drainage, Lighting
Infrastructure, Alteration
Bidding
Less than $2,500,000 est. value
IL 62205

DHS SP - FY21 Plumbing Repair and Maintenance
Term Contract
Post-Bid
$10,000 est. value
Kankakee, IL 60901

FY21 Air Release Inspection and Maintenance
Results
Gurnee, IL 60031

Electric, Plumbing, HVAC & Refrigeration/Mechanical
Alteration
Bidding
IL

ACA-Plumbing Service-MLB
Term Contract
Post-Bid
Springfield, IL 62712

Habitat for Humanity Senior Rehab Program
Results
Moline, IL 61265

Des Plaines Theatre Plumbing Fixtures
Post-Bid
Des Plaines, IL 60016

IDOT Various Improvements District 7 Plumbing
Results
Less than $100,000 est. value
Decatur, Effingham, IL 62521

HVAC and Plumbing Services for City of Urbana Facilities
Term Contract
Post-Bid
Urbana, IL 61801

Last Updated 07/19/2021 02:10 PM
Project Title

DNR Spitler Woods New ADA Vault Toilet at Long Creek

Physical Address View project details and contacts
City, State (County) Mount Zion, Springfield, IL 62549 (Macon, Sangamon Counties)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project to provide an ADA Men’s & Woman’s vault toilet with an accessible route from the parking lot to the vault toilet. SCOPE OF WORK: 1. The contractor will steak out the desired location for the ADA vault toilet. The contractor will be responsible for all excavating and grading. 2. The contractor will steak out the alignment for the ADA sidewalk from the parking lot to the location of the vault toilet. 3. The contractor will use IDNR’s standard vault toilet design to construct the vault toilet. 4. The contractor shall install underground electrical for exterior and interior LED lighting from the nearby existing power pole to the vault toilet. If expense is to great solar lighting L.E.D. light packs will be considered. 5. To have the availability of continuous power the contractor shall install underground electrical in conduit from the existing electrical panel approximately 150 Ft. to the ADA vault toilet. 6. The contractor will be responsible for all cleanup of debris and onsite construction material.

Details

Division 10 - Specialties, Compartments and Cubicles, Toilet Compartments.
Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents