Similar Projects
Rob Jaggers Main Water Line
Design
$200,000 to $400,000 est. value
NM

Finished Water 3A (FW3A) Pipeline
Bidding
Clovis, NM

Acequia Madre Pipeline Project
Bidding
San Mateo, NM

Construction Services
Post-Bid
Bernalillo, NM 87004

Walatowa Timber Industries Waterline Construction
Post-Bid
Jemez Pueblo, NM 87024

Advanced Metering Infrastructure
Results
Less than $963,817 est. value
Truth or Consequences, NM 87901

Chamberino Mutual Domestic Water Consumer and Sewer Association Water System Improvements Project
Results
Anthony, NM 88021

Maloney Avenue Waterline Replacement
Bidding
Gallup, NM 87301

P-Tunnel Waterline Replacement
Post-Bid
Albuquerque, NM 87131

2018 Colonias Water System Improvements
Results
$373,870 est. value
Lordsburg, NM 88045

Water System Improvements Phase II
Bidding
Jal, NM 88252

Jacquez Road Line Extension
Post-Bid
La Mesa, NM 88021

Alto 2 Well (H-1979-S7) Improvements
Results
Ruidoso, NM 88345

North Gonzales Waterline Replacement
Bidding
Las Vegas, NM

Wastewater System Improvements 2019
Post-Bid
Hagerman, NM 88232

Last Updated 05/15/2020 11:26 AM
Project Title

Construction of Highway 491 16" Transmission Water Main

Physical Address View project details and contacts
City, State (County) Gallup, NM 87305   (McKinley County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of installing approximately 7,100 linear feet of 16-inch CL350 ductile iron waterline as shown on the contract drawings. Work will include installation of 30” O.D. 0.375” wall steel casing with internal locking 16” CL350 ductile iron pipe by jack and bore under US491, tie-in connections to existing 16-inch ductile iron waterlines, the installation of a 2-inch water service, and will include installation of 16-inch gate valves, combination air release valves, removal and replacement of existing water lines may be required to meet minimum bury and separation at crossings. Fittings as required to meet horizontal and vertical deflections. Erosion control devices including gabions, wire enclosed rip-rap and soil reinforcement mat installation will be required. Installation of import fill and grading will be required. Traffic control will be required. Work will include trenching, backfilling, compaction, material hauling, and material testing. Rock excavation will be required. Advertisement and notification of water shut-off(s) of all affected customers 48 hours prior to shut-off is included in this project. This project is located North of Gallup, New Mexico within and adjacent to US-491 Right-of-Way between the intersections of US- 491 with 9 th Street and North Chino Loop (County Road 7).

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents