Similar Projects
Dooley Court
Bidding
$1,097,130 est. value
Salt Lake City, UT 84102

On-Call Task Order General Construction Services FY 19/20
Term Contract
Post-Bid
Salt Lake City, UT

1800 North Sewer Realignment
Post-Bid
Salt Lake City, UT 84116

2018 West Jordan Manhole Raising Project
Results
$161,900 est. value
West Jordan, UT

104th and Bangerter Relocation
Term Contract
Results
Less than $1,300,000 est. value
Bluffdale, UT 84065

19D: Large Meter Replacement Project
Post-Bid
West Valley City, UT

Installation and Repair of Sanitary Sewer Facilities
Results
Less than $125,000 est. value
Salt Lake City, UT

Manhole Lids, Rings, Monuments and Related Items
Term Contract
Post-Bid
Salt Lake City, UT

MP15 - 700 South Interceptor Capacity Upgrade and 700 South Water Main
Results
Less than $3,293,600 est. value
Salt Lake City, UT 84115

Cougar Lane Outfall 2A Sewer Relief Project
Post-Bid
Kearns, UT 84118

2018/2019 Various CIPP and Point Repair, Phase 1
Results
Less than $1,000,000 est. value
Salt Lake City, UT

Waste Water Sewer Cleaning and Maintenance
Term Contract
Post-Bid
Salt Lake City, UT 84114

Sewer Rehabilitation
Results
Less than $400,000 est. value
Salt Lake City, UT 84119

Drain Cleaning Services
Term Contract
Post-Bid
Draper, Ogden, Orem, Salt Lake City, West Valley City, UT 84020

Millcreek Guard Station Septic System Replacement
Results
Salt Lake City, UT

Last Updated 10/21/2020 11:35 AM
Project Title

Reclamation Construction Willard Peak Project: Phase I

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84114   (Salt Lake County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $44,000 to $47,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Provide:11 mine closures and revegetation of disturbed areas at abandoned hardrock mines in Weber and Davis Counties, Utah for the Reclamation Construction Willard Peak project: Phase I. The proposed work consists of the construction of backfills and solid concrete block walls in abandoned mine entrances to protect public safety. Most mine sites are accessible only on foot, and some are more than a half mile from a vehicle. These cases will likely require helicopter or pack animals to transport equipment and materials to the sites.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents