Similar Projects
Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Kelley Park Master Plan
Infrastructure
Conception
$1,000,000 CJ est. value
Apple Valley, MN 55124

Ardan Place Housing Development
New Construction
Design
Rosemount, MN 55068

Vermillion Acres Senior Living
New Construction - 99,300 SF
Design
$30,000,000 est. value
Hastings, MN 55033

I-35W Frontage Trail
Infrastructure
Bidding
$330,000 CJ est. value
Burnsville, MN 55337

Argenta Trail Drainage Improvements
Infrastructure
Bidding
$500,000 CJ est. value
Inver Grove Heights, MN 55077

Humidifier Replacement Project
Renovation
Sub-Bidding
$90,000 CJ est. value
Rosemount, MN 55068

Thompson County Park General Site Improvements
Post-Bid
$1,400,000 est. value
West Saint Paul, MN 55118

Defense Health Agency - Medical Facility Operations and Maintenance
Post-Bid
$2,500 to $90,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Results
$250,000 to $5,000,000 est. value

USPS IQ JOC Minnesota
Renovation
Results

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Eagle Pointe
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Apple Valley, MN 55124

Rivers of Life
New Construction, Infrastructure
Pending Verification
$7,000,000 CJ est. value
Eagan, MN 55121

Last Updated 08/05/2022 08:01 PM
Project Title

Dino Exhibit Phase II Construction

Physical Address View project details and contacts
City, State (County) Apple Valley, MN 55124   (Dakota County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $501,275 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

**As of August 5 2022, project was awarded to Albrecht Company bid amount $501,275. Anticipated End Date: estimated October 31, 2022. The Minnesota Zoological Garden is seeking a general contractor to complete the work needed to make the new play space, Dino Hideout, ready for guests in the summer of 2022. The general contractor will oversee the fabrication and installation of play features, the gateway entry, completion of grading and path work as shown in architectural drawings, irrigation system installation, and the plantings of horticulture products. The general contractor will need to coordinate their installation schedule with that of a shade structure manufacturer, interpretive signage installer, a fencing contractor, and a contractor's installation of the animatronic dinosaurs, such that the space can open as soon as possible after the July 8th completion of the dinosaur installation.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting and Coating, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents