Similar Projects
Beach Erosion Control and Hurricane Protection Project Bal Harbour Beach Renourishment 2020 Miami-Dade County, Florida
Bidding
$10,000,000 to $20,000,000 est. value
Miami, FL

CDBG Drainage Improvements and Water Main Installation
Bidding
$1,971,586 est. value
FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Sweetwater Drainage Improvements: Phase 8A
Post-Bid
Sweetwater, FL 33174

SE Florida Sediment Morphodynamics
Results
Everglades, Lake Worth, Miami, Palm Beach, FL 32207

Parking Lot Resealing at Trails and Tails Park and Veterans Park
Results
Less than $22,000 est. value
Doral, FL 33178

Bill Baggs Cape Florida State Park – ADA Sidewalk Renovations
Bidding
Key Biscayne, FL 33149

South Miami-Dade Salt Intrusion Barrier Project
Post-Bid
Less than $500,000 est. value
Miami, FL 33128

Drainage Improvements Multiple Sites
Results
Less than $366,769 est. value
FL

Harvest Center Sidewalk Improvements
Post-Bid
Homestead, FL

Canal Bank Stabilization Program: Year 7
Results
Less than $2,250,000 est. value
Doral, FL 33166

Madeleine Village Apartments Seawall Replacement
Post-Bid
Less than $530,000 est. value
Miami Beach, FL 33139

Pinecrest Gardens Parking Lot Resurfacing
Results
Less than $425,000 est. value
Pinecrest, FL 33156

Design and Construction of Concrete Hurricane-Resistant Screen Wall at Miami Job Corps Center
Post-Bid
$250,000 to $500,000 est. value
Miami Beach, FL 33056

Drainage Improvements Multiple Sites
Results
Less than $549,382 est. value
Miami, FL 33128

Last Updated 11/19/2020 08:19 AM
Project Title

Loren Roberts Park Improvements-CDBG NR FFY 2017

Physical Address View project details and contacts
City, State (County) Florida City, FL 33034   (Miami-Dade County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $848,664
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of constructing a parking lot with drainage, lighting and landscape improvements. The improvements will include the reconstruction of NW 5th Avenue from NW 4th St. to Davis Parkway, the installation of a drainage system and creation of on-street parking on both sides of NW 5th Ave.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents