Similar Projects
Gary Sanitary District 27th and Chase Pump Station Force Main Replacement - Section 219, Gary, Lake County, Indiana (USACE Acquisition)
Design
$1,000,000 to $5,000,000 est. value
Gary, IN

Lake Station Crossroads Lift Station Replacement - Section 219, Lake Station, Lake County, Indiana (Usace Acquisition)
Renovation
Design
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Monroeville Wastewater Improvements
Renovation
Bidding
Monroeville, IN

Water System Improvements Quercus Grove Pressure Zonenew Booster Station
New Construction
Bidding
Patriot, IN

Rivoli Theater Stabilization
Renovation
Post-Bid
Indianapolis, IN 46201

Water Utility Improvements, Division "C" - Phase 3
Post-Bid
Crown Point, IN 46307

Hague Road and Allisonville Road Lift Stations Improvements
Results
$2,000,000 est. value
Fishers, IN 46038

ARV & Pump Station & Force Main Replacement
Results
Clarksville, IN 47129

WWTP Improvements Phase 2A - Sludge Processing Improvements and Phase 2B - New Sludge Processing Building
Post-Bid
Bristol, IN

Daylight South Lift Station Rehab
Results
Evansville, IN 47708

Lake Station Crossroads Lift Station Replacement, Lake Station, Lake County, Indiana (Usace Acquisition)
Post-Bid
$1,000,000 to $5,000,000 est. value
Lake Station, IN

Lakeside Sewer Relocation
Results
La Porte, IN 46350

Perry Crossing Lift Station Rehabilitation
Post-Bid
Sellersburg, IN

Perry Lakes Lift Station Improvements
Results
Fort Wayne, IN 46802

Truesdell Lift Station and Sewer Extension
Post-Bid
La Porte, IN 46350

Reported 07/23/2021 12:00 AM
Project Title

WTP Chemical Feed Building Addition and Lift Station Improvements

Physical Address View project details and contacts
City, State (County) Loogootee, IN   (Daviess County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The addition of a new chemical feed building at the WWTP to chemically reduce the phosphorous limits of the wastewater effluent to 1.0 mg/l. Electrical upgrades to various lift stations throughout the system

Details

Lift and Pump Stations, Addition.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents