Similar Projects
Demolition of Structures, Estes Park Loop
Demolition
Post-Bid
Estes Park, CO 80517

Demolition of Structures At 1117 Pine Street
Demolition
Post-Bid
Pueblo, CO 81004

Needham Elementary Connect Phase II
Results
Less than $1,000,000 est. value
Durango, CO

Professional Developement Center Demolition
Results
Thornton, CO 80229

Clock Tower Demolition and Disposal
Post-Bid
Frisco, CO 80443

West 72nd Avenue Residential Demolition
Demolition
Results
Less than $62,000 est. value
Arvada, CO 80002

Demolition for 439 South 2nd Street
Post-Bid
Montrose, CO

West 72nd Avenue Residential Demolition
Demolition
Results
Arvada, CO 80002

Interior Demolition Services
Term Contract
Post-Bid
Westminster, CO 80030

New Construction for Allison Village
Results
Arvada, CO 80002

Disposition of Mobile Homes
Post-Bid
Boulder, CO 80304

Demolition Services at 12190 Sheridan Boulevard
Results
Broomfield, CO

Gould Property Building and Structure Abatement and Demolition
Post-Bid
Firestone, CO

WW Summit Concrete Demo
Results
Federal Heights, CO 80260

Demolition of Old Mesa Pawn Shop
Post-Bid
Grand Junction, CO 81501

Last Updated 02/19/2021 11:54 PM
Project Title

Wolf Creek Pass Demo

Physical Address View project details and contacts
City, State (County) South Fork, CO 81154   (Rio Grande County)
Category(s) Heavy and Highway
Sub-Category(s) Demolition
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Requiring demolition services for two buildings located at Highway 160 A Milepost 167.7, South Fork, CO 81154. There are two buildings included in the demolition with descriptions as follows: 1) Maintenance Building (ID 1000/5/176): This building consists of one-story with approximately 3,000 square feet and was constructed in 1979. The building is a metal-framed structure with a sheet metal roof system. Exterior building materials include sheet metal and interior materials include sheet metal, wood and concrete. Fiberglass building insulation is located within the ceilings and walls of the structure. The contractor shall remove the entire structure and all footers and the foundation along with the associated floor drains and oil/sand separator tanks and associated piping (the tanks are approximately 1,500-gallons and the demolition contractor will arrange to have the liquids removed and include this in their bid). The fuel tank and lift station shall remain in place. The contractor shall move the generator adjacent to the fuel tank. There is non-friable black perimeter tar/caulking (approximately 200 linear feet), non-friable black tar on concrete (approximately 5 square feet reported) and white/tan front door caulking (approximately 25 linear feet) which will remain in place for building demolition. 2) Sand Shed (ID 1000/5/178): This structure consists of one-story with approximately 2,400 square feet constructed in 1976. The structure consist of a wood and metal frame with a wood plank interior and a dirt floor. Any asphalt or concrete beneath the structure shall be removed as part of the demolition along with any building foundation. The exterior walls and roof consist of sheet metal.

Details

Division 02 - Existing Conditions, Demolition.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents