Similar Projects
Windbrooke Section 3 - Phase II
New Construction
Conception
Huber Heights, OH 45424

North Broadway Residential Subdivision
New Construction
Conception
Dayton, OH 45426

Quail Ridge Subdivision
New Construction
Design
Huber Heights, OH 45424

Carriage Trails Section 6, Phase V-A
New Construction
Design
Huber Heights, OH

Leonard B. Stubbs Park Improvements Phase I
Renovation, Infrastructure
Bidding
$3,918,000 CJ est. value
Centerville, OH 45458

Mot - Lamme Road Improvement Project
Infrastructure
Bidding
$2,600,000 CJ est. value
Miami Township, OH 45439

Rugby and Sunny view Plat Improvements
Infrastructure
Post-Bid
$265,355 est. value
OH

Center Street Improvements Phase 4
Infrastructure
Post-Bid
$375,000 est. value
Farmersville, OH 45325

2021 Street Overlay Program
Results
Clayton, OH

Paving Repairs
Results
Dayton, OH 45417

Wolf Creek Homes
New Construction - 46,536 SF
Construction
$8,000,000 est. value
Dayton, OH 45417

Trinity Community at Beavercreek - United Church Homes
Addition, Demolition, Infrastructure - 168,000 SF
Pending Verification
$8,000,000 CJ est. value
Beavercreek, OH 45440

The Foodbank Expansion
Addition, Demolition, Infrastructure - 6,000 SF
Pending Verification
$5,188,349 CJ est. value
Dayton, OH 45417

Hunter's Path
New Construction
Conception
Clayton, OH

Carriage Trails Section 6, Phase V-II
New Construction
Design
Huber Heights, OH

Last Updated 10/17/2022 10:53 AM
Project Title

Willow Hills Residential Subdivision

Physical Address View project details and contacts
City, State (County) Dayton, OH 45404   (Montgomery County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Paving/Reconstruction, Single-Family Homes, Site Development
Contracting Method Bids by Invitation
Project Status Contract Award, Construction start expected October 2021
Bids Due View project details and contacts
Estimated Value $100,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of October 4, 2022 the construction is underway new construction of a 45 single family residential development. The developer will be acting as the general contractor. information regarding an architect has not been disclosed. While a firm construction timeline has not yet been established, the construction is expected to be complete in April 2023.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents