Similar Projects
Janitorial Supplies
Term Contract
Sub-Bidding
Concord, NH 03301

Boundary Line Maintenance Brushing Painting Blazing and Placing State Boundary Signs
Term Contract
Sub-Bidding
Concord, NH 03301

Aluminum Sign Blanks, Planks
Term Contract
Post-Bid
Concord, NH 03301

Process of Miscellaneous Hot and Cold Rolled Steel in Less Than Mill Quantities
Term Contract
Post-Bid
Concord, NH 03301

UNH Dispatch Center Equipment
Term Contract
Sub-Bidding
Concord, NH 03301

Traffic/Econolite Signal Cabinet
Term Contract
Post-Bid
Concord, NH 03301

Asphalt
Term Contract
Post-Bid
Concord, NH 03301

Septic/Holding Tank Pumping and Disposal Services
Term Contract
Post-Bid
Concord, NH 03301

Snow Removal Services
Term Contract
Post-Bid
Concord, NH 03301

RFQ Construction Manager at Risk - Construction Manager Services
Term Contract
Post-Bid
Concord, NH 03301

Natural Gas Generator Emissions Testing
Term Contract
Post-Bid
Pembroke, NH 03275

Sludge Removal from Lagoon #1 and Lagoon #2
Term Contract
Post-Bid
Boscawen, NH 03303

Concrete (Delivered and/or Pumped)
Term Contract
Post-Bid
Concord, NH 03301

Portable Toilets
Term Contract
Post-Bid
Concord, NH 03301

Traffic Control Devices
Term Contract
Post-Bid
Concord, NH 03301

Last Updated 09/26/2023 05:36 AM
Project Title

Rooftop Snow Removal at the Tobey Building

Physical Address View project details and contacts
City, State (County) Concord, NH 03301   (Merrimack County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Inquiries must be submitted by e-mail to Erik Bal at the following address: Erik.P.Bal@nhes.nh.gov. A single vendor will be awarded the contract for rooftop snow removal services. This will be a one (1) year contract. Vendors must also submit one (1) identical "COPY" of the bid response which must be clearly and permanently marked "COPY" on the front. Vendors mailing their responses must allow for sufficient time for delivery by the deadline. Bids received later than the mspecified date and time may not be considered. Contractor shall furnish necessary labor, equipment, and expertise to remove excess snow from rooftops and building perimeters at the Tobey Building, 45 South Fruit Street, Concord, NH (18,000-20,000 sq. ft. PVC membrane roof). Contractor will leave approximately 6" of snow to protect roof surfaces and materials. Snow removed from roofs and deposited into walkways, parking areas, or in front of HVAC equipment, generators or windows, must be removed. The Tobey Building and other State facilities do not have space for on-site snow storage. Removal of shoveled snow from facilities should be done immediately if possible, but always within 48 hours. The State reserves the right to cancel this solicitation at any time prior to contract award in which case all responses will be rejected.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents