Similar Projects
Flowers Chapel Road Widening Phase II - City of Dothan
Infrastructure
Conception
$5,100,000 CJ est. value
Dothan, AL 36305

Fire Station #10 Construction - City of Dothan
New Construction, Infrastructure
Design
$5,500,000 CJ est. value
Dothan, AL 36301

Dothan Fire Stations #10 and #3
New Construction, Infrastructure - 26,000 SF
Bidding
$550,000 CJ est. value
Dothan, AL 36301

Resurfacing of 7th Avenue, George Cook Street, Henry Bolden Street, Oak Street and 5th Avenue
Infrastructure
Bidding
$691,000 CJ est. value
Ashford, AL 36312

Plaza Drive to Tacoma St. Drainage Improvements Bid
Infrastructure
Post-Bid
$300,000 CJ est. value
Dothan, AL 36301

Plaza Drive / Oak Drive Drainage Improvements
Infrastructure
Post-Bid
$430,000 CJ est. value
Dothan, AL 36301

New Building for SARCOA
New Construction, Infrastructure - 12,600 SF
Results
$4,248,000 CJ est. value
Dothan, AL 36305

Jester Street Sidewalks
Infrastructure
Results
$563,116 CJ est. value
Cowarts, AL 36321

Dothan Landfill Expansion - City of Dothan
Infrastructure
Pending Verification
$6,200,000 CJ est. value
Dothan, AL 36303

Dothan Solar Project
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Dothan, AL 36301

Bituminous Surface Treatment
Infrastructure
Bidding
$369,000 CJ est. value
Ashford, AL 36312

2022 Bid on Components and Materials for Laver Hills Pump Station Rehabilitation
Renovation
Post-Bid
Dothan, AL

Flowers Chapel Road Phase 1 (US-84 to Woodmere Drive)
Infrastructure
Results
$2,735,466 CJ est. value
Dothan, AL 36305

2022 Bid on Components and Materials for Whitfield Pump Station Rehabilitation
Renovation
Post-Bid
Dothan, AL

Safety Widening, Micro-Milling, Resurfacing, and Traffic Stripe on SR-53
Infrastructure
Results
$5,963,720 CJ est. value
Dothan, AL 36303

Last Updated 03/10/2023 06:35 PM
Project Title

Refurbishment of Water Wells (Well Numbers 19, 26 and 28)

Physical Address View project details and contacts
City, State (County) Dothan, AL 36301   (Houston County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $668,540 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Bids can be mailed to the following: Attn: Purchasing P.O. Box 2128 Dothan, AL 36302 The project work consists of furnishing all material, equipment and labor to refurbish City of Dothan's Water Wells (Well Numbers 19, 26 and 28). The owner reserves the right to waive any informality or to reject any or all bids. No bidder may withdraw his bid within sixty (60) days after the actual date of the opening thereof. Each bidder shall furnish name, address and telephone number of at least one (1) supervisor, who will be used on this project, with a minimum of five (5) years' experience in Water Well Refurbishment. Each bidder shall comply with all applicable State and Local laws concerning licensing, registration, and regulation of firms doing business in the State of Alabama. Bidder(s) must have Contractor's license issued by the Alabama State Board of Contractors.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents