Similar Projects
Oasis Water Treatment Plant Improvements - CIPWA61055 - City of Glendale
Infrastructure
Conception
Glendale, AZ 85303

South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

Dysart Road Sewer Replacement - Riley to Corral - U0045 - City of Avondale
Infrastructure
Design
$3,435,000 est. value
Avondale, AZ 85392

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

World-Wide Water Storage Tank Remediation
Term Contract
Results

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Destination at Gateway (Berge) Offsite Paving and Waterline Williams Field Road
Infrastructure
Bidding
$1,300,000 to $1,500,000 est. value
Mesa, AZ 85212

Construction of Sun City Festival Ranch Infrastructure Sewer for Parcel E2
Post-Bid
Buckeye, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Underground Storage Tank Replacement - Cipfc19037 - City Of Glendale
Alteration
Conception
$615,000 est. value
Glendale, AZ 85301

Reported 07/08/2022 12:50 PM
Project Title

Rancho Santa Fe Reservoir Coating Repairs and Rehabilitation - 1539 - City of Avondale

Physical Address View project details and contacts
City, State (County) Avondale, AZ 85392   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Storage/Water Tanks, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected March 2024
Bids Due View project details and contacts
Estimated Value Less than $1,460,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This is the last of six operational steel reservoirs that have not been rehabilitated. This project includes initial tank inspections, identifying required improvements and repairs, design and rehabilitation as needed for the 1 million gallon (MG) Rancho Santa Fe west reservoir As of July 07, 2022, this project is currently in the FY 2023 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2023.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents