Similar Projects
Buckhead Tower Ritz-Carlton and Condos
New Construction
Conception
Atlanta, GA 30326

Summerhill Hotel Redevelopment
Renovation - 206,000 SF
Conception
Atlanta, GA 30312

Signia Hilton Atlanta
New Construction - 911,400 SF
Design
$220,000,000 est. value
Atlanta, GA 30313

The Carpentry Boutique Hotel
New Construction
Design
$2,300,000 est. value
Dalton, GA

KSU - Aquatic Structures Maintenance and Repairs
Infrastructure
Bidding
Kennesaw, GA 30144

Oglethorpe Block Redevelopment
Renovation
Bidding
Brunswick, GA

Springhill Suites by Marriott
New Construction, Demolition - 62,501 SF
Post-Bid
$9,000,000 est. value
Covington, GA 30015

WoodSpring Suites
New Construction - 48,660 SF
Post-Bid
$9,000,000 est. value
Duluth, GA 30097

Temple Tract Development
Results
Sugar Hill, GA

J078-- Pool and Spa Preventive Maintenance Augusta VAMC
Results
Augusta, GA 30904

Candlewood Suites
New Construction - 48,850 SF
Construction
$5,000,000 est. value
Smyrna, GA 30080

Towne Place Suites Marriott
New Construction - 61,200 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Hapeville, GA 30354

760 Ralph McGill Hotel
New Construction
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30303

Home2Suites and Tru Hotel
New Construction
Pending Verification
College Park, GA

Dream Atlanta Buckhead
New Construction
Design
Atlanta, GA

Reported 12/28/2021 11:43 AM
Project Title

Comfort Suites

Physical Address View project details and contacts
City, State (County) Newnan, GA 30265   (Coweta County)
Category(s) Commercial, Entertainment/Recreation
Sub-Category(s) Hotel/Motel, Swimming Pool(s)
Contracting Method
Project Status Building in Operation as of December 2021
Bids Due View project details and contacts
Estimated Value $4,800,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Hotel/Motel, 4 Stories Above Grade, 47,265 SF New Construction, 75 Unit(s), Swimming Pool(s), Demolition.
Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating, Special Coatings, Cementitious Coatings.
Division 13 - Special Construction, Swimming Pools, Recirculating Gutter Systems, Swimming Pool Accessories, Swimming Pool Cleaning Equipment.
Division 14 - Conveying Equipment, Elevator Equipment and Controls.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Pool and Fountain Plumbing Systems, Swimming Pool Plumbing Systems.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Special Purpose Lighting, Underwater Lighting.
Division 31 - Earthwork, Site Clearing, Earth Moving, Grading, Excavation and Fill.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents