Similar Projects
C.R. 557 Force Main Installation
Infrastructure
Bidding
$1,515,739 est. value
Lake Alfred, FL

Utilities Potable Water and Reclaimed Water Maintenance Connection and Replacement of Meters
Infrastructure
Bidding
Bartow, FL

3 Line - Pipe Repair 2, 4, 6" O.D.
Post-Bid
Lakeland, FL

Wilkins Model 975 Xl2 Backflow Preventer 3/4",1",2"
Post-Bid
Lakeland, FL

Hilochee Structure Replacement - Phase 1
Term Contract
Results
Less than $230,000 est. value
Lake Alfred, FL 33850

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Cascades Phase 2 Improvements
Post-Bid
Haines City, FL

County Line Road Water Main Extension
Results
Lakeland, FL

1 1/2",2" Wilkins Model 975Xl2 Backflow Preventer
Post-Bid
Lakeland, FL

Gibson Oaks Offsite Pipeline Improvements
Results
Less than $4,944,000 est. value
Lakeland, FL 33809

Backflow Preventers 3/4,1,1 1/2, 2 Wilkins, 3/4 Febco
Infrastructure
Post-Bid
Lakeland, FL

Gibson Oaks Water Production Facility
Results
Less than $11,000,000 est. value
Lakeland, FL 33809

Pre-Qualified Bidders - English Oaks Force Main Phase III
Infrastructure
Post-Bid
Lakeland, FL

New Reclaimed Water Main, Master Force Main Replacement and Pollard Road Water Treatment Plant Phase I-Water Main
Results
Winter Haven, FL 33881

Miscellaneous Utility Construction Services
Infrastructure
Post-Bid
Lake Wales, FL

Last Updated 11/10/2021 01:44 PM
Project Title

Ernie Caldwell Reclaimed Water Main Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Winter Haven, FL 33880   (Polk County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of the installation of new reclaimed water mains and connection to existing reclaimed water mains. The purpose of the project is to expand the reclaimed water service by extending 16” reclaimed water main. The project is part of the Northeast Regional Utility Service Area (NERUSA) master plan. The reclaimed water main construction consists of approximately 13,600 linear feet of 16-inch pipe, including miscellaneous appurtenances, as well as the crossing of other various existing utilities.Regional Utility Services Area

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents