Similar Projects
Mount Zion Loop Office Buildings
New Construction - 20,200 SF
Conception
$4,300,000 est. value
Yulee, FL 32097

Citrona Drive Pedestrian Improvements LAP Project
Infrastructure
Design
$400,000 CJ est. value
Fernandina Beach, FL 32034

Citrona Drive Pedestrian Improvements LAP Project
Infrastructure
Design
$400,000 CJ est. value
Fernandina Beach, FL 32034

Amelia Island Trail - Segment 1
Infrastructure
Bidding
$3,000,000 CJ est. value
Fernandina Beach, FL 32034

Amelia Island Trail - Segment 1
Infrastructure
Bidding
$3,000,000 CJ est. value
Fernandina Beach, FL 32034

Wildlight Master Infrastructure
New Construction
Post-Bid
Yulee, FL

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

Asphalt Services
Results
FL

Alternative Paving Methods
Results
FL

The Offices at Village Center in Wildlight
New Construction - 162,000 SF
Construction
$10,000,000 CJ est. value
Yulee, FL 32097

Furnish and Install an Engineered Commercial Grade Metal Building (Storage Shed)
New Construction, Infrastructure
Bidding
$100,000 CJ est. value
Callahan, FL 32011

Wildlight PDP #3 Wildlight Avenue
Infrastructure
Post-Bid
Yulee, FL

Strategic Resource Evaluation Study - Highway Construction Materials
Infrastructure
Results

SR 25 (US 41 / US 441) from I-75 (SR 93) to CR 252
Infrastructure
Post-Bid
$9,805,526 est. value

CR-108 from Middle Road to US-17
Infrastructure
Results
FL

Last Updated 08/01/2022 02:01 PM
Project Title

Pinnacle Plastering Office/Warehouse

Physical Address View project details and contacts
City, State (County) Yulee, FL 32097   (Nassau County)
Category(s) Commercial, Heavy and Highway, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $1,100,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of August 1, 2022 the project is in early planning stage. The Nassau County Development Review Committee held a pre-application meeting on July 19, 2022. Information regarding the architect, general contractor and method of selection has not been disclosed. The construction timeline has not been determined, but is not expected to begin before the spring of 2023.* *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

1 Story Above Grade. 1 Story Above Grade.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Screening Devices, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents