Similar Projects
Williams Road UD/Street/Streetscape and Median Island - 9071 - City of Salinas
Infrastructure
Conception
$7,513,800 CJ est. value
Salinas, CA 93905

Williams Road UD/Street/Streetscape and Median Island - 9071 - City of Salinas
Infrastructure
Conception
$7,513,800 CJ est. value
Salinas, CA 93905

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

The Park Lane
New Construction, Infrastructure
Design
$16,500,000 CJ est. value
Monterey, CA 93940

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

Cold Plane, Place HMA and RHMA and Shoulder Widening
Infrastructure
Bidding
$2,400,000 CJ est. value
Monterey, CA 93940

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

Place Polymer Modified Emulsion Chip Seal Coat on Existing Roadbed
Infrastructure
Post-Bid
$670,000 est. value

Construct Retaining Wall, Widening Shoulder and Place HMA
Infrastructure
Results
$1,490,000 est. value
CA

Sacramento Street Road Diet and Rehabilitation Project
Infrastructure
Results
$715,000 est. value
Salinas, Vallejo, CA 94590

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

Hotel Durell / Pacific Grove
New Construction, Infrastructure - 68,400 SF
Pending Verification
$12,000,000 CJ est. value
Pacific Grove, CA 93950

West Laurel Drive Improvements - 9145 - City of Salinas
Infrastructure
Conception
$150,000 CJ est. value
Salinas, CA 93906

America's Tire / Seaside
New Construction, Infrastructure - 11,191 SF
Design
$3,000,000 CJ est. value
Seaside, CA 93955

FY 21/22 Pavement Rehabilitation Project
Infrastructure
Bidding
$3,000,000 CJ est. value
Seaside, CA 93955

Last Updated 08/26/2022 12:33 AM
Project Title

Emerald Drive - 9318 - City of Salinas

Physical Address View project details and contacts
City, State (County) Salinas, CA 93906   (Monterey County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected July 2024
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace damaged sidewalks and curb and gutter. Remove and replace street trees that have damaged or will damage the sidewalks. As of August 26, 2022, this project is currently in the FY 2023-2028 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2023. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents