Similar Projects
"The Node" Mixed-Use Development
New Construction - 305,060 SF
Conception
$10,000,000 CJ est. value
Cincinnati, OH 45220

Urbana Solar
New Construction
Conception
Saint Paris, Urbana, OH 43072

Arlington Gateway
New Construction, Renovation - 471,705 SF
Design
$100,000,000 est. value
Upper Arlington, OH 43221

Parkside On Pearl
New Construction
Design
$5,000,000 to $10,000,000 CJ est. value
Columbus, OH 43085

Y--Expand Patient Parking Garage - Cleveland - Minor Construction
New Construction
Post-Bid
$2,000,000 to $5,000,000 est. value
Cleveland, OH

Improvements To Hampton Pointe Drive
New Construction
Post-Bid
Cincinnati, OH 45248

2019 Facility Improvements
Results
Less than $2,253,600 est. value
Sylvania, OH 43560

UC University Avenue Garage Structural Repair
Results
Less than $665,000 est. value
Cincinnati, OH

15th and High Mixed Use Development
New Construction
Construction
Columbus, OH 43201

AC Hotel
New Construction, Demolition - 94,975 SF
Construction
$30,000,000 to $40,000,000 est. value
Columbus, OH 43215

Victory Parkway Apartments
Renovation - 40,000 SF
Pending Verification
$3,000,000 est. value
Cincinnati, OH 45206

Jeffrey Park - Phase 9
New Construction - 100,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Columbus, OH 43227

Bridge Park - Block G
New Construction, Build-Out - 335,884 SF
Design
$10,000,000 CJ est. value
Dublin, OH 43017

Dodd - Parking Garage
Post-Bid
Less than $33,000,000 est. value
Columbus, OH

The Banks Phase IIIB
Results
$3,847,771 est. value
OH

Last Updated 05/26/2020 09:11 AM
Project Title

Bus and Maintenance Garage Phase 1 Site Work

Physical Address View project details and contacts
City, State (County) Andover, OH 44003   (Ashtabula County)
Category(s) Heavy and Highway
Sub-Category(s) Parking Garage, Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $700,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work included under this contract consists of site work, including but not necessarily lim-ited to clearing, grubbing, utility installation of storm sewer, sanitary sewer, waterline, storm water detention pond, grading, 304 subbase placement, and building pad prepara-tion including the furnishing of all labor, superintendence, materials, tools and equip-ment, and all necessary appurtenances and restoration for performing all work necessary to complete the work in accordance with the Contract Documents. This contract does not include the building structure which will be under a separate contract.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 10 - Specialties, Signage, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 11 - Equipment, Vehicle and Pedestrian Equipment.
Division 21 - Fire Suppression.
Division 26 - Electrical, Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents