Similar Projects
Construct Norview Elementary School - City of Norfolk
New Construction, Infrastructure
Conception
$35,500,000 CJ est. value
Norfolk, VA 23510

Rehabilitate Berkley Avenue Bridge - City of Norfolk
Infrastructure
Conception
$6,000,000 CJ est. value
Norfolk, VA 23523

Chenman - Phase II
New Construction, Infrastructure - 81,650 SF
Design
$16,000,000 CJ est. value
Norfolk, VA 23517

Apartments / Norfolk
New Construction, Infrastructure, Alteration
Design
$35,000,000 est. value
Norfolk, VA 23518

Norfolk International Terminal (NIT) Shoreline Restoration
Infrastructure
Bidding
$104,450 CJ est. value
Norfolk, VA 23505

Norfolk International Terminal (NIT) Shoreline Restoration
Infrastructure
Bidding
$104,450 CJ est. value
Norfolk, VA 23505

Pier Repairs, Fort Norfolk
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Norfolk, VA 23510

Pier Repairs, Fort Norfolk
Infrastructure
Post-Bid
$5,000,000 CJ est. value
Norfolk, VA 23510

Pier 11 South Berth Expansion and Maintenance Dredging
Term Contract, Alteration
Results
$10,000,000 est. value
Norfolk, VA 23511

Multi-Use Trail Construction Projects
Infrastructure
Results
$400,000 CJ est. value
Hillsboro, VA 20132

The Railyard at Lamberts Point
New Construction, Infrastructure
Construction
$3,000,000 CJ est. value
Norfolk, VA 23508

Perry Glass Studio at Chrysler Museum of Art Addition
Addition, Infrastructure - 22,112 SF
Construction
$12,000,000 CJ est. value
Norfolk, VA 23510

Embody Inc Research And Development Expansion
New Construction, Infrastructure - 10,000 SF
Pending Verification
$5,000,000 CJ est. value
Norfolk, VA 23508

Attain at Newtown
New Construction, Infrastructure
Pending Verification
$158,000,000 CJ est. value
Norfolk, VA 23502

Improve Park Place Drainage - City of Norfolk
Infrastructure
Conception
$7,200,000 CJ est. value
Norfolk, VA 23510

Last Updated 10/09/2023 08:33 AM
Project Title

Norfolk International Terminals NIT North Wharf Improvements

Physical Address View project details and contacts
City, State (County) Norfolk, VA 23505   (Norfolk City County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Dock/Pier/Marine, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected December 2023
Bids Due View project details and contacts
Estimated Value $2,300,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The purpose of this Invitation for Bids (IFB) is to solicit bids to establish a Contract through competitive sealed bids for construction within the existing Norfolk International Terminal (NIT), encompassing improvements to the North Wharf consisting of, but not limited to, installation of a new 120 gage ship-to-shore crane rail (select structural demolition of portions of the wharf, demolition of landside pavement and trench drain, installation of piles through the wharf deck, installation of landside piles, reinforced concrete pile caps/beams/slabs over water and on land, waterside and landside crane rail/tie-downs/pin sockets/stops, below wharf suspended conduit and utility vaults), demolition of existing wharf marine fenders and mooring hardware, installation of new marine fenders and mooring bollards, installation of a steel sheet pile toe wall, wharf repairs (spalls, cracks, joints, rebar coupler, pile jackets, etc.), and mooring dolphins (installation of concrete piles and reinforced concrete, catwalks, mooring bollards, capstans). All questions shall be sent electronically to proposalsVPA@portofvirginia.com. All email communications shall contain Project Code 2024-02-VPA in the subject line followed by the Respondents name. Questions may only be submitted electronically no later than: 2:00 P.M. EST October 13, 2023. Owners right is reserved to reject any or all Bids for any reason deemed to be in the best interest of the Owner, as determined in the Owners sole discretion The Work will be substantially complete by the following dates: Phase 1: 444 days from Notice to Proceed Phase 2: 629 days from Notice to Proceed The Work will be completed in all respects by following dates Phase 1: 487 days from Notice to Proceed Phase 2: 672 days from Notice to Proceed

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents