Similar Projects
Main Avenue Improvements - 36375 - City of Aztec
Infrastructure
Conception
$3,558,838 CJ est. value
Aztec, NM 87410

Main Avenue Improvements - 36375 - City of Aztec
Infrastructure
Conception
$3,558,838 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

East Aztec Arterial Phase 2 - New Mexico Department of Finance and Administration
Infrastructure
Design
$17,045,150 CJ est. value
Aztec, NM 87410

RFP - San Juan Lateral Water Treatment Plant (SJLWTP)
New Construction, Infrastructure
Bidding
$350,000,000 CJ est. value
Waterflow, NM 87421

Construction Services For an San Juan County Industrial Park Improvements
Infrastructure
Bidding
$300,000 CJ est. value
La Plata, NM 87418

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFQ Contractor - El Vado Dam Spillways and Dam Crest Modification Project
Infrastructure
Post-Bid
$86,000,000 CJ est. value
Tierra Amarilla, NM 87575

Bergin Substation Rebuild - Civil Work
Infrastructure
Results
$660,000 est. value
Farmington, NM

Dine' College South Campus Fire Lane
Infrastructure
Results
$700,000 CJ est. value
Shiprock, NM 87420

Welding Facility San Juan College
New Construction, Renovation, Infrastructure
Pending Verification
$650,000 CJ est. value
Farmington, NM 87401

Hartman Sports Complex - 23882 - City of Aztec
New Construction, Infrastructure
Conception
$3,800,000 CJ est. value
Aztec, NM 87410

North Main Avenue Extension - New Mexico Department of Finance and Administration
Infrastructure
Design
$3,000,000 CJ est. value
Aztec, NM 87410

Routes N546 and N547 - Shiprock: Clearing and Grubbing
Infrastructure
Bidding
$600,000 CJ est. value
Shiprock, NM 87420

N36 Safety - Borrow
Infrastructure
Post-Bid
$300,000 est. value
Waterflow, NM

Last Updated 08/21/2023 12:27 PM
Project Title

Roadway Reconstruction, Bridge Replacement, ITS

Physical Address View project details and contacts
City, State (County) Farmington, NM 87401   (San Juan County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $19,878,657 [brand] Estimate
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Termini: Us 64, Mp 7.308 to Mp 8.124 for 0.816 Miles County: San Juan (District 5) Type of Work: Roadway Reconstruction, Bridge Replacement, Its Contract Time: Mandatory Completion Date of November 22, 2024 Dbe Goal: at This Time Nm dot Will Meet the State Dbe on Federally Assisted Projects Through a Combination of Raceneutral and Race-conscious Measures. This Project is Subject to Race-conscious Measures. The Established Dbe Goal for This Project is 0.00%. Licenses: (Ga-1 or Ga-98) and (Gf-2 or Gf-98) and (Ee-98) Funding Type: Federal-aid Listing Threshold: None Wage Rate (Federal): Nm20230035 Wage Rate (State): Type "a" (2023) As a condition to submitting a Bid all Bidders bidding as Contractors are required to be prequalified with the NMDOT's Office of Inspector General seven (7) Days before Bid Opening per 18.27.5 NMAC. All Subcontractors are required to be prequalified before performing any Work and prior to supplying goods or services to the Project. The Bidders prequalification factor rolling average will be applied to any Project with an engineers estimate greater than $5 million. All Bidders submitting Bids valued over sixty thousand dollars ($60,000.00) shall be registered with the Department of Workforce Solutions (DWS), Labor Relations before Bidding. The Bidder's registration number shall be included on the Bid Form. If a Bidder appears on the DWS list of willful violators of the Public Works Minimum Wage Act (NMSA 13-4-14), the NMDOT shall reject the Bid and shall continue to reject Bids from that Bidder for three years after the date of publication of the list. The Bidders Bid Guaranty shall be five percent (5%) of the Bidders Total Bid Amount and shall be submitted before Bid Opening through either Surety 2000 or Tinubu Surety. Failure of the Bidder to comply with this Advertisement shall render the Bid non-responsive and the Bid shall be rejected. NMDOT - 001 - Roadway Reconstruction, Bridge Replacement, ITS

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents