Similar Projects
Dry- Dock and Overhaul Services for the M/V Governor
Post-Bid
Falmouth, MA

Two Float Replacements
Post-Bid
Bourne, MA 02532

Dry-Dock and Overhaul Services for the M/V Eagle
Results
$1,917,691 est. value
Falmouth, MA

Oak Bluffs Structural Pier Repairs 2020 - Phase II
Results
$752,524 est. value
Falmouth, MA

Crosby Yacht Yard
New Construction
Construction
Osterville, MA

Fendering Replacement at Woods Hole Laboratory, Nefsc
Post-Bid
Falmouth, Woods Hole, MA 02543

Dry-Dock and Overhaul Services for the M/V Woods Hole
Results
$761,882 est. value
Falmouth, MA

Oak Bluffs and Vineyard Haven Pile Wrap Project
Infrastructure
Post-Bid
$1,342,266 est. value
Falmouth, MA

Sesuit Harbor Floating Docks
Results
Dennis, MA 02660

Drydock and Overhaul Services for the M/V Iyanough
Infrastructure
Post-Bid
Falmouth, MA

Remove and Replace Three Treated Timber Piles at Bass River Boat Ramp
Results
$24,939 est. value
Yarmouth, MA 02664

Ockway Bay Boat Ramp Reconstruction
Infrastructure
Post-Bid
Mashpee, MA

Fishing and Boating Access
Results
$24,939 est. value
Yarmouth, MA

Pier Upgrades for New Training Vessel
Infrastructure
Post-Bid
$16,500,000 est. value
Bourne, MA 02532

Drydock and Overhaul Services for the M/V Gayhead
Results
$1,131,455 est. value
Falmouth, MA

Last Updated 12/02/2021 04:17 PM
Project Title

Barnstable Harbor Outer Entrance Channel Maintenance Dredging Project

Physical Address View project details and contacts
City, State (County) Hyannis, MA   (Barnstable County)
Category(s) Heavy and Highway
Sub-Category(s) Dock/Pier/Marine
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $400,000
Plans Available from Municipal Agency - 11/17/21
Owner View project details and contacts
Architect View project details and contacts
Description

The work to be performed under this contract includes, but is not limited to,Mechanical dredging of an estimated ±4,192 cubic yards (CY) of sediment from the existing outer-portion of the Barnstable Harbor Entrance Channel. Sediments are to be dewatered (as required), trucked and stockpiled within the Sandy Neck Public Beach parking lot for future reuse as nourishment by the Town.

Details

Division 35 - Waterway and Marine Construction, Common Work Results for Waterway and Marine Construction, Waterway and Marine Construction and Equipment, Marine Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents