Similar Projects
Last Updated | 10/13/2023 06:04 PM |
Project Title | Sierra Vista HVAC Replacement - Building 600 |
Physical Address | View project details and contacts |
City, State (County) | Sierra Vista, AZ 85635 (Cochise County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids |
Project Status | Sub-Bidding, Construction start expected June 2024 |
Bids Due | View project details and contacts |
Estimated Value | $700,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Question Deadline 09/25/2023 Any question related to a solicitation should be directed to Janet Cramer, Procurement Specialist via email at cramerj@cochise.edu Unless otherwise noted, there is no charge to the vendor to participate in this solicitation. Cochise College reserves the right to reject any or all bids, in whole or in part, to waive any informality in any bid, and to accept the bid which, in its discretion, is in the best interest of Cochise College. 1. The project will take place at the Law Enforcement Building (Bldg. 600) at the Sierra Vista Campus. 2. Remove, replace, and dispose of six (6) gas/electric rooftop package units. 3. The units will be as follows: a. 4 - 5 ton b. 1 - 6 ton c. 1 - 2 ton 4. All units need to be Trane and have manual fresh air dampers, hail guards, and internal filters. 5. All low-voltage wiring will be done by Cochise College. 6. Line voltage wiring will be done by the contractor, using existing disconnects. The seal tight from the disconnect needs to be replaced, and a properly sized wire disconnect if needed will be provided by the contractor. 7. Condensate lines need to be connected to existing condensate lines. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |