Similar Projects
Last Updated | 08/01/2022 04:03 PM |
Project Title | RFP Engineering - Project Development Services |
Physical Address | View project details and contacts |
City, State (County) | Rushville, IN 46173 (Rush County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Bridge, Paving/Reconstruction, Site Development, Water Lines |
Contracting Method | Competitive Bids |
Project Status | Obtained from a credible source, Awaiting verification, Construction start expected May 2023 |
Bids Due | View project details and contacts |
Estimated Value | $9,455,774 [brand] Estimate |
Plans Available from | State Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Project Development Services Two HMA Overlays, a Small Structure Replacement and a Small Structure/Drain Replacement in Rush and Shelby Cos. Owner Office Greenfield District / Capital Program Mgmt Contract Type Project Specific Compensation Method Lump Sum Two Step Scoring No Allowable Profit Rate 8.8% Plus Overhead Factor Is Federal Funding Involved Yes # of Firms to Select 1 he selected firm will perform the design and plan development work necessary to produce construction contract documents. The selected firm will be required to perform an Engineering Assessment, Environmental Documentation, Topographic Survey, Hydraulic Analysis (if needed), all Permits, Geotechnical Services, Utility Coordination, Design and Plan Development, Pavement Design, Right of Way Plan Development (including Abstracting, R/W Engineering, R/W Staking as needed) and Construction Phase Services. Additional services may also be required if small culverts are found that INDOT determines should be replaced with the project limits. INDOT will provide R/W Acquisition Services, if needed. The selected consultant's fee proposal shall be due 45 calendar days after the selection date of this RFP item. The contract may utilize the INDOT eInvoice application. 2001857 - Des 2001857, SR 3 HMA Overlay, Preventive Maintenance, from 3.06 mi S of SR 244 (Rush/Decatur Co Line) to US 52 S junct, in Rush Co. RP 079+046 to RP 090+045 // Des 2001868, US 52 HMA Overlay, Preventive Maintenance, from 4.9 mi E of SR 9 (ECL Morristown) to 0.91 mi W of SR 3 N junct. (WCL Rushville), in Rush and Shelby Cos,.RP 111 + 091 to RP 124+067 // Des 2002272, SR 3 Small Structure Replacement, 2.16 mi N of Decatur / Rush Co. Line in Rush Co. RP 81+068 // Des 2002317, US 52 Small Structures & Drains Construction, in Rush Co., RP 124+064 - $9,455,774.00 Prequalification Required: Yes INDOT - RFP Engineering - Project Development Services As of August 1, 2022, the design firm selection has not been disclosed. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. |
||||||||||||||||||||||
Details |
|
||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |