Similar Projects
Public Library Carpet Replacement
Alteration
Results
$29,000 est. value
Lewiston, ME 04240

2021 Floor Replacements
Alteration
Post-Bid
Presque Isle, ME

2021 Snow Hall Carpet Removal and Flooring Installation
Alteration
Post-Bid
Presque Isle, ME

Flooring Replacement
Alteration
Results
Presque Isle, ME

Install Tarket VCT Tile in Curtis Hall Dorms
Post-Bid
Castine, ME

Flooring Replacement at Rodick Lorraine Apartments
Renovation
Design
$225,000 CJ est. value
Bar Harbor, ME 04609

Dearborn Gym Floor Resurfacing Project
Post-Bid
Farmingdale, ME

Carpet Replacement
Alteration
Post-Bid
$83,000 est. value
Bethel, ME

Flooring Replacement Project
Alteration
Post-Bid
Lincoln, ME 04457

Fleet - Maintenance Garage Floor Replacement
Alteration
Results
Bangor, ME 04401

Advanced Structures and Composites Center W2 Sloping Floor
Renovation
Sub-Bidding
$300,000 CJ est. value
Orono, ME 04469

Flooring Bid - Clerk's Office
Alteration
Post-Bid
Skowhegan, ME 04976

Community Center Flooring
Post-Bid
Biddeford, ME 04005

Apparatus Bay Concrete Floor Coating
Alteration
Results
$400,000 est. value
Kennebunk, ME 04043

Last Updated 08/18/2022 10:07 AM
Project Title

Town Office Flooring

Physical Address View project details and contacts
City, State (County) Tremont, ME 04653   (Hancock County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $60,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Town of Tremont is accepting bids for new flooring on the upper office level of the Town Office. The Select Board expects to announce its decision within 30 days after bids are received. The Town will be the sole judge of the acceptability of the bids, and may reject any or all bids or waive any informalities or defects in bids if it is judged to be in the Town's best interest. It is the responsibility of the prospective bidder to examine the bid specifications to ensure that he/she fully understands the bid requirements. Any questions regarding the bid should be directed to Town Manager Jesse Dunbar at (207) 244-7204 well before the bid opening. Office hours are 8:00 a.m. to 4:00 p.m. Monday through Friday. Any errors or omissions detected by prospective bidders should be brought to the attention of the Town Manager well before the bid opening. All work performed must meet established industry standards of quality and be acceptable to the Town Manager. Alternate specifications will be considered, subject to Town approval. Any alternate specifications proposed must be shown on the Bid Form under Exceptions and Comments, and a complete manufacturers description must be attached to the bid The bid award will be based on the following criteria, not necessarily in the order listed: Price, Quality and performance of flooring, and Installation Date Contractor agrees to maintain Commercial General Liability insurance with a limit of not less than $1,000,000 for bodily injury and property damage claims which arise from operations under this contract. Contractor agrees to name the Town as an additional insured for Property and Casualty, Motor Vehicle, and Workers Compensation Coverage. Contractor agrees to maintain Business Auto Liability insurance with a Combined Single Limit of not less than $1,000,000. Contractor agrees to maintain Workers Compensation coverage per Maine State Statute and Employers Liability with aggregate limits of not less than $500,000. The contractor will require of their insurance company(ies) that should any of the limits be changed or coverages be cancelled on the above mentioned policies, the contractors insurance carrier(s) will notify the Town in writing 30 days in advance. The Contractor will provide to the Town a Certificate of Insurance evidencing the above mentioned coverages before the project begins and upon subsequent renewals for a period not less than two years after the project is completed. The Contractor is responsible for all subcontractors and will require the subcontractors meet the insurance requirements.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents