Similar Projects
Hollenbachs Bridge
Demolition, New Construction, Infrastructure
Conception
$2,284,370 CJ est. value
Schnecksville, PA 18078

Limeport Pike over Saucon
Infrastructure
Conception
$3,490,250 CJ est. value
Coopersburg, PA 18036

Powder Valley Road over Indian Creek
Demolition, New Construction, Infrastructure
Design
$993,950 CJ est. value
Zionsville, PA 18092

LVTS Urban ITS
Infrastructure
Design
$3,469,053 CJ est. value
Allentown, PA 18104

Lehigh Race Street Intersection
Infrastructure
Bidding
$10,000,000 CJ est. value
Allentown, PA 18109

Lehigh Valley Maintenance Building Rebid
New Construction, Infrastructure - 4,800 SF
Bidding
$3,000,000 CJ est. value
Upper Saucon Township, PA 18034

Emmaus Commerce Center
Alteration
Post-Bid
Emmaus, PA 18049

Bogerts Covered Bridge Rehabilitation Project
Infrastructure
Post-Bid
$2,000,000 CJ est. value
Allentown, PA 18101

World-Wide Water Storage Tank Remediation
Term Contract
Results

Ultraviolet System Installation - General
Renovation
Results
Center Valley, PA

Whitehall-Coplay School District New Elementary School - General
New Construction, Infrastructure - 95,835 SF
Construction
$22,424,000 CJ est. value
Whitehall, PA 18052

Maulfair Drive Drainage Improvements Project
Infrastructure
Construction
$395,899 CJ est. value
Salisbury Township, PA 18103

Penn Square Section 6
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Allentown, PA 18103

Taco Bell / Breinigsville
Demolition, New Construction, Infrastructure
Pending Verification
$900,000 CJ est. value
Breinigsville, PA 18031

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Last Updated 01/23/2023 12:08 PM
Project Title

Digester Lid Removal Project

Physical Address View project details and contacts
City, State (County) Slatington, PA 18080   (Lehigh County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Sewage Treatment Plant, Site Development, Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $194,799 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves of the removal and disposal of an anaerobic digester lid at the Borough of Slatington Wastewater Treatment Plant including the removal of associated fixtures, cleaning of the tank, and coating the existing tank. Please submit all inquiries and questions via the Questions tab. Do not call or e-mail the engineer or owner. Clarification Deadline: 1/4/2023 10:00 AM.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Decking, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, Facility Fuel Piping, Facility Fuel-Storage Tanks, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents