Similar Projects
Bridgeland Central - Master Development
New Construction - 506,000 SF
Conception
Cypress, TX 77433

Residential Development
New Construction
Conception
Magnolia, TX 77355

Greenville Avenue Townhomes
New Construction
Design
Richardson, TX 75081

Westwood at Rayzor Ranch
New Construction
Design
Denton, TX

Development Opportunities
Bidding
El Paso, TX

Lamar Place Multi-Family - 90CD
New Construction - 143,000 SF
Bidding
$40,000,000 est. value
Austin, TX 78752

Bel-Air Village Apartments
New Construction - 352,395 SF
Sub-Bidding
$85,000,000 est. value
Sherman, TX 75092

3510 Dennis Street Townhomes
New Construction - 10,000 SF
Sub-Bidding
$1,300,000 est. value
Rowlett, TX 75088

Rehabilitate the Interior and Exterior of Allen Parkway Villages and Historic Oaks of Allen Parkway Villages
Renovation
Post-Bid
Houston, TX 77019

Agape 19th Street Townhomes
Renovation
Post-Bid
Plano, TX 75086

Redevelopment of the Approximately 19-Acre St. John Site
Results
Austin, TX 78767

Phase 3 Housing Demolition TSTC in Waco
Demolition
Results
Waco, TX 76705

Princeton Crossroads
New Construction
Construction
Princeton, TX 75407

Henderson Street Development
New Construction
Construction
Cleburne, TX 76031

Leander Springs
New Construction - 856,000 SF
Pending Verification
$10,000,000 CJ est. value
Leander, TX 78641

Reported 07/21/2022 12:00 AM
Project Title

Village Cooperative / Allen

Physical Address View project details and contacts
City, State (County) Allen, TX 75013   (Collin County)
Category(s) Residential
Sub-Category(s) Multi-Family Homes
Contracting Method General Contractor to Subcontract by Invitation Only.
Project Status Sub-Bidding, Construction Start Expected August 2022,
Bids Due View project details and contacts
Estimated Value $25,000,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

MW Builders is pleased to extend an invitation to bid on the construction of Village Cooperative of Allen Texas. The project consists of 3 buildings with a total of 60 units, an underground parking structure, and 4-stories of wood frame construction. Work includes but is not limited to Excavation, Utilities, Paving, Landscape/Irrigation, Site Furnishings, Concrete, Precast Planks, CMU foundation walls, Gypcrete, Masonry, Steel, Rough & Finish Carpentry, Waterproofing/Caulking, Asphalt Roofing, Siding/Soffits/Fascia, Fireproofing, Doors/Hardware, Residential OH Doors, Windows, Glass & Glazing, Drywall, Flooring, Painting, Wallcovering, Sanitary Wall Paneling, Specialties, Appliances, Trash Chute, Blinds, Elevators, Fire Sprinkler, HVAC, Plumbing, & Electrical Bids must be good for 30 days, and duration of the project is 547 calendar days. Include all applicable taxes in the proposals.

Details

Multi-Family Homes, 4 Stories Above Grade, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents