Similar Projects
South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Transmission Mains - Southeast Mesa - CP0828 - City of Mesa
Infrastructure
Conception
$866,058 est. value
Mesa, AZ

Water Treatment Services at All District Sites
Infrastructure
Bidding
Tempe, AZ

Construction of Sun City Festival Ranch Infrastructure Sewer for Parcel E2
Post-Bid
Buckeye, AZ

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Construction Manager at Risk - Mesquite Street Lindsay to Val Vista ST2117 Ka-Lo Park- 29th Place Elliot to Mesquite Street
Infrastructure
Bidding
$5,669,000 est. value
Gilbert, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Reported 06/24/2022 12:50 PM
Project Title

Water Reclamation Facilities Upgrades and Improvements - City of Tempe

Physical Address View project details and contacts
City, State (County) Tempe, AZ   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected January 2023
Bids Due View project details and contacts
Estimated Value $27,471,367 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project provides a funding source for expansion and improvements for the city's local reclaimed water infrastructure. As of June 23, 2022, this project is included in the City of Tempe's FY 2021-2026 CIP. Information regarding a design team and the contractor selection has not been disclosed. A firm timeline for construction has not been established. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents