Similar Projects
Lime Sludge Handling Process - City of Margate
Infrastructure
Conception
$5,000,000 CJ est. value
Margate, FL 33063

West Central Boulevard Wet Pond - SW-6 - City of Cape Canaveral
Infrastructure
Conception
$2,500,000 CJ est. value
Cape Canaveral, FL 32920

Marigold Avenue Apartments
New Construction, Infrastructure
Design
$100,000,000 CJ est. value
Poinciana, FL 34758

Arterial Roadway Landscaping - Phase II - E2002 - Town of Jupiter
Infrastructure
Design
$540,000 CJ est. value
Jupiter, FL 33458

Fernandina Harbor Maintenance Dredging 35 and 36-Foot Project
Infrastructure
Sub-Bidding
$5,000,000 CJ est. value
Fernandina Beach, FL 32034

Grounds Maintenance Services
Term Contract
Sub-Bidding
Hialeah, FL 33013

Brownsville - 3300 West Desoto Street Asbestos Abatement
Alteration
Post-Bid
Pensacola, FL 32505

Environmental Testing (Generating Stations Emissions)
Term Contract
Post-Bid
Jacksonville, FL 32226

Environmental Services
Term Contract
Results
Jacksonville, FL

Water Monitoring Services, Term Contract
Term Contract
Results
Ocala, FL

MLK Demolition
Demolition, Infrastructure
Construction
$250,000 CJ est. value
Panama City, FL 32401

Mold Remediation
Renovation
Construction
$11,250 CJ est. value
Gainesville, FL 32601

Carrington Pines
New Construction, Infrastructure - 2,878 SF
Pending Verification
$49,158,216 CJ est. value
West Palm Beach, FL 33407

International Drive Wet Pond - SW-5 - City of Cape Canaveral
Infrastructure
Conception
$300,000 CJ est. value
Cape Canaveral, FL 32920

Structure Demolition
Demolition, Infrastructure
Design
$200,000 CJ est. value
Bunnell, FL 32110

Last Updated 01/18/2023 06:01 PM
Project Title

Wastewater Treatment Plant (WWTP) Improvements - Flexible Membrane Disc Diffuser

Physical Address View project details and contacts
City, State (County) Punta Gorda, FL 33982   (Charlotte County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status All Bids Received, Results Expected, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value
Plans Available from Construction Manager
Owner View project details and contacts
Architect View project details and contacts
Description

Wharton-Smith is the Construction Manager at Risk who is soliciting proposals and assuring that MBE and WBE firms are used, when possible, for the City of Punta Gorda Wastewater Treatment Plant Improvements 2022. Bid packages available to bid on include sitework, concrete, mechanical, roofing, doors & hardware, overhead doors, paint & coatings, metal building systems, HVAC, electrical, geotechnical improvements, instrumentation & controls, prestressed concrete tanks, stainless steel slide gates, rotary screw blowers, axially split case pumps, end suction process pumps, double disc pumps, submersible solids handling pumps, submersible axial flow pumps, step screens, variable-speed submersible mixers, secondary clarifier equipment, coarse bubble diffusers, flexible membrane disc diffuser, and emergency generator/fuel tank. Question Deadline 12/23/2022 Questions or clarifications can be emailed to EstimatingFtMyers@whartonsmith.com.

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents