Similar Projects
New Brunson Elementary School
New Construction
Conception
Winston-Salem, NC 27101

Carthage Elementary School Replacement
New Construction
Conception
$54,000,000 est. value
Carthage, NC

Vance Elementary School Renovation & Repairs
Renovation - 81,975 SF
Design
$3,250,000 est. value
Asheville, NC 28806

River Light Elementary
New Construction - 90,000 SF
Design
$22,000,000 to $30,000,000 est. value
Wilmington, NC

Eastover-Central Elementary School HVAC Renovation
Renovation
Bidding
$1,123,456 CJ est. value
Eastover, NC 28312

East Franklin Elementary Addition and Renovations
Addition, Demolition, Build-out, Infrastructure - 7,000 SF
Bidding
$3,200,000 CJ est. value
Franklin, NC 28734

VPA K-5 School - ITP Group 4 - Remaining Trades
New Construction - 124,497 SF
Sub-Bidding
$33,000,000 CJ est. value
Greensboro, NC 27401

Subcontractors - New Es Hidden Valley, Jw Grier, Newell Relief Project
Renovation - 102,000 SF
Post-Bid
$34,697,022 est. value
Charlotte, NC 28215

Tabor City Pre-Kindergarten - Eighth Grade School
Renovation
Post-Bid
$23,000,000 est. value
Tabor City, NC 28463

Bond Project Renovations Pleasant Grove Elementary School
Renovation - 49,999 SF
Results
Burlington, NC

HCPS Upward Elementary Construction Manager at Risk
Renovation
Results
$850,000 est. value
Flat Rock, NC

Providence Day School
Renovation, Addition - 20,744 SF
Construction
$4,711,200 est. value
Charlotte, NC 28270

Cameron Park Elementary School Renovation (Phase 1)
Renovation
Construction
Hillsborough, NC 27278

New Elementary School F Project
New Construction, Infrastructure - 108,000 SF
Pending Verification
$49,326,165 CJ est. value
Durham, NC 27713

Ashley Academy Replacement - 2016 Bond - Winston-Salem Forsyth County Schools
New Construction
Pending Verification
$9,000,000 est. value
Fayetteville, NC 28304

Last Updated 03/21/2023 12:41 PM
Project Title

New Elementary School - 2022 Bond - Johnston County Schools

Physical Address View project details and contacts
City, State (County) Four Oaks, NC 27524   (Johnston County)
Category(s) Education
Sub-Category(s) Elementary School
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $40,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A detailed scope of work has not been disclosed. As of January 9, 2023, this project is in the conceptual phase. The owner in in the process of selecting an architect and an award should be made by mid February 2023. A firm timeline for construction has not been determined.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents