Similar Projects
Conservatory Roof and Fire Sprinkler Replacement
Post-Bid
Kure Beach, NC

Repair of the Fire Station 24 Metal Roof Truss System
Post-Bid
Raleigh, NC 27617

Fuller Administration Building Roof Replacement
Results
Durham, NC

Replacement of Roofs in the Bryant Apartments Complex
Results
Less than $126,102 est. value
Grifton, NC 28530

Cabarrus County Governmental Center Skylight Replacement Project
Construction
Concord, NC 28026

Partial Roof Replacement at Daniels Middle School
Results
Raleigh, NC

Health and Physical Education Center Partial Roof Replacement
Results
Less than $641,130 est. value
Fayetteville, NC 28301

New Roof and Overflow Drains at Solomon Towers
Results
Wilmington, NC

Metal Roofing at Youngsville Elementary School
Results
Youngsville, NC 27596

Garwood Hall Roof Replacement
Results
Boone, NC

Joint Force Headquarters Paver Replacement
Results
Less than $453,000 est. value
Raleigh, NC 27607

145th CE Repair Roofing Project for Building 51 & 5
Results
$500,000 to $1,000,000 est. value
Charlotte, NC 28208

Cordelia Camp Building - Roof Replacement
Results
Cullowhee, NC

Mcgee Building - Roof Replacement
Results
Less than $618,700 est. value
Morehead City, NC 28557

C. Wayne Collier Elementary School Reroof Building 2
Results
Hope Mills, NC 283482198

Reported 05/19/2021 12:00 AM
Project Title

Fire Station 10 Roof Replacement

Physical Address View project details and contacts
City, State (County) Durham, NC 27712   (Durham County)
Category(s) Single Trades
Sub-Category(s) Roofing
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Remove existing shingles down to the wood decking. 1. Replace any damaged decking (submit square foot price) 2. Install synthetic underlayment over wood decking. 3. Install ice and water shield around penetrations and along rake and eaves. 4. Install starter shingles at rake and eaves. 5. Re-use existing metal flashings (sand and paint). 6. Replace all pipe flashings. 7. The asphalt shingles are to be min. 30yr. Architectural shingles over 30lb roofing felt. Peal-and-stick roof underlayment (ice and water shield) is to be applied to the roof deck at all eaves, roof edges and transitions from roof to vertical walls (behind the flashing).

Details

Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents