Similar Projects
Commercial Storage Facility
New Construction - 34,800 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Sister Bay, WI 54234

Multi-Tenant Commercial Building - Storage Units
New Construction - 46,080 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Caledonia, WI

Motor Vehicle Storage Building -MEP
New Construction
Bidding
$1,400,000 est. value
Madison, WI 53704

Renovation for Archives GPC
Renovation - 12,267 SF
Bidding
$1,921,000 est. value
Milwaukee, WI 53211

FEMA Safe Room & Link
Addition
Post-Bid
Spencer, WI 54479

Sabish Middle School
Renovation
Post-Bid
Fond du Lac, WI 54935

Disaster Recovery Services
Results

Disaster Recovery Services
Results

Thiele Heating & Air Conditioning
New Construction - 4,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Beloit, WI 53511

Viking Electric Proposed Building
New Construction - 10,000 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Wausau, WI 54401

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Business Park - HSA Franklin
New Construction - 297,626 SF
Pending Verification
$64,000,000 est. value
Franklin, WI

Redevelopment Construction Of A Climate Controlled Self-Storage Facility
New Construction - 43,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Brookfield, WI 53005

Woodworth Middle School Interior Remodeling and Renovations
Renovation
Post-Bid
Fond du Lac, WI 54935

Pole Barn Insulation
Results
Pewaukee, WI 53072

Reported 08/12/2021 12:00 AM
Project Title

Storage Building

Physical Address View project details and contacts
City, State (County) Crivitz, WI 54114   (Marinette County)
Category(s) Commercial, Education
Sub-Category(s) Middle/Senior High School, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The contractor will be responsible for the construction of a storage building including, but not limited to, excavation, concrete flatwork, framing, roofing and siding

Details

Warehouse/Storage, New Construction, Middle/Senior High School, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Windows, Door Hardware, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Parking Control Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents