Similar Projects
145th Street East Warehouse and Distribution Development
New Construction, Infrastructure - 830,000 SF
Conception
$89,600,000 CJ est. value
Rosemount, MN 55068

Greenway Development: Minnesota River Greenway - Fort Snelling Segment - P00127 - Dakota County
Infrastructure
Conception
$7,425,139 CJ est. value
Eagan, MN 55123

Vermillion Acres Senior Housing
New Construction, Infrastructure
Design
$30,000,000 CJ est. value
Hastings, MN 55033

River's Edge Development
New Construction, Infrastructure
Design
Farmington, MN

North Creek Channel Improvement Project
Infrastructure
Bidding
$2,000,000 CJ est. value
Lakeville, MN 55044

Playground Wood Fiber Blown Installation
Post-Bid
MN

Agricultural Lab Building Infrastructure Improvements
Renovation, Alteration
Post-Bid
$19,126,000 est. value
Saint Paul, MN 55155

Farmington High School Tennis Courts
Results
Farmington, MN 55024

Stair Replacement - Archery Trail
Renovation
Results
$180,000 est. value
Rosemount, MN 55068

Eagle's Landing Subdivison
Construction
Inver Grove Heights, MN 55076

Orchard Place Retail Center
Addition - 24,800 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Apple Valley, MN 55124

Cliff Road Multi-Residential
New Construction, Infrastructure
Pending Verification
$60,000,000 CJ est. value
Eagan, MN 55122

Floor & Decor / Apple Valley
Demolition, New Construction, Infrastructure - 152,916 SF
Pending Verification
$5,000,000 CJ est. value
Apple Valley, MN 55124

Kelley Park Master Plan
Infrastructure
Conception
$1,000,000 CJ est. value
Apple Valley, MN 55124

Highlands at Settlers Ridge Residential Development
New Construction, Infrastructure
Design
Inver Grove Heights, MN

Last Updated 09/19/2022 07:08 AM
Project Title

Afton State Park Prescribed Grazing FY23

Physical Address View project details and contacts
City, State (County) Hastings, MN 55033   (Dakota County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $500,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The Department of Natural Resources is seeking bids for for prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. General Project Description: This bid solicitation is for prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. The primary vegetation targeted for removal includes buckthorn, prickly ash, honeysuckle and sumac. The 2 project locations are near the Visitor Center (T27, R20, S2) and park office (T27, R20, S10). See attached project maps for approximate size and location of paddocks. The project involves grazing one paddock near the Visitor Center and one paddock near the park office. The total project area is 43.5 acres split between the two different paddocks. 1. The Visitor Center area (17.5 acres) is completely surrounded by park maintenance roads and trails. Parts of this area have been hand cut or brush mowed over the last four years. Brush size ranges from first year re-sprouts to 10+ foot tall buckthorn. The Visitor Center area is mixed between flat on top and sloped (average 21% slope) with a north/northwest aspect. Access to this project area will be via park maintenance road. 2. The Office area (26 acres) is surrounded by park roads, trails, and restored prairie. Previous cutting in this area was done more than five years ago. Brush size ranges from seedling to 10+ foot tall buckthorn. The office area is a mixture of flat and sloped (average 32% slope) with a south/southeast aspect. Access to the top of this area is near the park shop. Access to the bottom of this area will be from the main park road. The work covered under this solicitation shall consist of the labor, equipment, materials, tools, transportation, and incidentals necessary prescribed rotational goat grazing on 43.5 acres at Afton State Park in Washington County. The goal of the project is to reduce the density of woody shrubs in bluff prairie and oak woodland communities. The primary vegetation targeted for removal includes buckthorn, prickly ash, honeysuckle and sumac. The contract that results from this Request for Bids prohibits any construction trade work as defined by the Department of Labor, Prevailing Wage Division and Minn. Stat. 177.41 through 177.44. Bid Bond: 5% ASSURANCE OF COMPLETION (PAYMENT AND PERFORMANCE BOND) Not applicable SCHEDULE / TIME OF COMPLETION Work cannot commence before receipt of Notice to Proceed. Final Completion of the work shall be on or before June 30, 2023.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents