Similar Projects
DS-56 Banana River Tank Improvements - CP-WS-17-BR - City of Cocoa
Infrastructure
Conception
$675,000 CJ est. value
Cocoa, FL 32924

WT-63 Replacement of Dyal Finished Water Steel GST - WS18RD - City of Cocoa
Infrastructure
Conception
$5,000,000 CJ est. value
Cocoa, FL 32924

Flight Simulator Facility, Patrick Air Force Base, Florida
New Construction
Design
$10,000,000 to $25,000,000 est. value
Patrick AFB, FL

Cape Canaveral Launch Operations and Infrastructure Support
Renovation
Design
Less than $489,000,000 est. value
Cape Canaveral, FL

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Construct a Flight Simulation Facility at Patrick Air Force Base, FL.
New Construction
Post-Bid
$10,000,000 to $25,000,000 est. value
Patrick AFB, FL

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

DBEH 20-1563 Repair Lift Station Various
Renovation, Infrastructure
Results
$1,292,211 CJ est. value
Cape Canaveral, FL 32920

Element by Marriott / Melbourne
New Construction, Infrastructure - 118,930 SF
Construction
$36,000,000 CJ est. value
Melbourne, FL 32903

RFP D/B - Design and Construction of Zone 3 - WEG HQ/Maintenance Hangar and Apron Facilities
New Construction, Infrastructure - 211,419 SF
Construction
$195,651,603 CJ est. value
Tyndall AFB, FL 32403

Eau Gallie Office Park, Phase 6 - Makoto's Addition
Addition, Demolition, Renovation, Infrastructure - 3,913 SF
Pending Verification
$1,000,000 CJ est. value
Melbourne, FL 32934

SpaceX Operations Area / Kennedy Space Center
New Construction, Infrastructure - 480,000 SF
Pending Verification
$258,000,000 CJ est. value
Titusville, FL 32780

Lee Wenner Park Renovation - CD18LW - City of Cocoa
Renovation, Infrastructure
Conception
$9,340,000 CJ est. value
Cocoa, FL 32922

Mosswood Townhomes Subdivision
New Construction, Infrastructure
Design
$15,652,160 CJ est. value
Melbourne, FL 32935

Starbucks / Melbourne
Demolition, New Construction, Infrastructure - 2,503 SF
Post-Bid
$762,000 CJ est. value
Melbourne, FL 32901

Last Updated 05/16/2023 09:04 AM
Project Title

Renovate B402/Demo B561, Patrick SFB

Physical Address View project details and contacts
City, State (County) Patrick Air Force Base, FL 32925   (Brevard County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Military Facility, Site Development
Contracting Method Competitive Bids
Project Status Results, Request for Qualifications, Construction start expected June 2023
Bids Due View project details and contacts
Estimated Value $2,706,766 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of providing the labor, equipment and materials to repair and renovate Bldg 402 to include all building systems, finishes, lighting, HVAC, restrooms, break room and administrative areas. This scope also includes the demolition of Bldg 561. All work shall meet the current State of Florida Building Code and the 45th Space Wing Installation Facilities Standard (IFS). Site Visit: April 24th, 2023 at 0900 AM EST Participants will meet at-- Bldg. 402. Submit site visit attendees' name, date of birth, Driver's License, Issue State, and Social Security number to POCs listed on page 1, block 10, of Sol. no later than 18 April 2023 at 12:00 PM EST. Site visit is limited to three (3) attendees per prime contractor. Reference sol. Attachment 8 - Rules of Engagement for additional site visit details. Questions: All questions should be submitted using Attachment 5 - Question & Answer Template, to ALL points of contacts listed above and must be received no later than April 26, 2023 @ 1:00 PM Eastern Standard Time (EST). Questions received after this date may not be answered. All answers will be posted to www.sam.gov as an amendment to the solicitation announcement. Proposals Due: All bids are to be submitted NOT LATER THAN 11 May 2023 @ 1:00 PM Eastern Standard Time (EST). NOTE: Amendment 1 published 2 May 23 to add Amendment 01, Attachment 9 - Hazmat Report, and Attachment -10 Q&As. Reference Amendment 01, Attachment 9 and Attachment 10 in updated list of attachments. 3 May 23: Attachment 10 Q&As has been corrected and uploaded.

Details

1 Story Above Grade, 28,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents