Similar Projects
Striping, Legends, Miscellaneous Traffic Control Devices, Maintenance Services
Infrastructure
Sub-Bidding
$500,000 CJ est. value
San Juan Capistrano, CA 92675

Irrigation Controllers for Saddleback College
Renovation
Sub-Bidding
$100,000 CJ est. value
Tustin, CA 92780

Generator Maintenance and Repairs
Term Contract
Post-Bid
Sacramento, Vina, CA 95811

Skate Park Upgrades
Alteration
Post-Bid
$960,000 est. value
Brea, CA

Senior Center Generator
Term Contract
Results
$170,000 est. value
Brea, CA 92821

WRP Sluice Gate Replacement Project
Infrastructure
Results
$70,000 est. value
San Clemente, CA 92673

Elevator Maintenance and Repair Services
Term Contract
Sub-Bidding
$388,000 CJ est. value
Irvine, CA 92606

Secondary Treatment VFD Replacements at Plant No. 2
Infrastructure, Alteration
Post-Bid
$1,632,000 est. value
Fountain Valley, Huntington Beach, CA 92646

Luminaires, Cross Arms, Fuses, and Electrical Materials
Alteration
Results
Anaheim, CA 92805

Anaheim West Tower Parking Garage E V Charger
Alteration
Post-Bid
$850,000 to $900,000 est. value
Anaheim, CA

Underground District No.67 Sycamore Street
Alteration
Results
$11,000,000 est. value
Anaheim, CA

Lighting Improvements Boiler and Sludge dewatering Areas at Plant No 1
Term Contract
Post-Bid
$85,000 est. value
CA

Cabrillo Park Irrigation Renovation
Renovation, Term Contract, Alteration
Results
$600,000 est. value
Santa Ana, CA

Irvine Ranch Water District Well Water Treatment System
Alteration
Post-Bid
$4,500,000 est. value
Orange, CA

Electrical Materials Pad Mounted Switches
Alteration
Results
Anaheim, CA

Last Updated 03/28/2023 11:07 AM
Project Title

Accessible Pedestrian Signal Systems - Phase 3 Project

Physical Address View project details and contacts
City, State (County) Lake Forest, CA 92630   (Orange County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $53,339 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of Accessible Pedestrian Signal Systems at the following signalized intersections to further assist the visually impaired to cross the street: o Lake Forest Drive / Trabuco Road o Lake Forest Drive / Chinook o El Toro Road / Rockfield Boulevard o El Toro Road / Arbor Way o El Toro Road / Raymond Way Response Format Electronic and Paper Project Type Bid Response Types Line Items General Attachment Type of Award Lump Sum License Requirements C-10 Liquidated Damages $500/day Project Duration 30 calendar days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 02/21/2023 5:00 PM (PST) For further information, contact Tran Tran, Traffic Engineering Manager, at ttran@lakeforestca.gov or (949) 461-3485.

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents