Similar Projects
Material Rock Salt
Term Contract
Sub-Bidding
University Park, IL 60484

Collection and Disposal of Residential Waste, Recyclable Material and Yard Waste
Term Contract
Sub-Bidding
Cerro Gordo, IL 61818

DQSF - Portable Sanitation
Alteration
Post-Bid
Du Quoin, IL 62832

Pest Control Services
Alteration
Post-Bid
IL

Sewer Televising and Cleaning Services
Term Contract, Alteration
Results
Woodstock, IL

Downtown Crystal Lake Commuter Station Parking Pay Terminals
Term Contract
Results
Crystal Lake, IL 60014

JPMC SW Facility MRO Industrial Supplies
Term Contract
Sub-Bidding
Springfield, IL 62703

Natural Deicer
Term Contract
Post-Bid
Woodstock, IL 60098

Overhead Door Maintenance
Alteration
Results
Peoria, IL

Water Treatment Chemicals
Term Contract
Sub-Bidding
Evanston, IL 60201

Weatherization Program
Term Contract
Post-Bid
IL

Water Purification Chemicals
Alteration
Results
Bloomington, IL

Residential Refuse and Recycling Collection Program
Term Contract
Sub-Bidding
Monticello, IL 61856

Miscellaneous Lamps, Bulbs, Ballast And Accessories
Term Contract, Alteration
Post-Bid
Less than $500,000 est. value
Chicago, IL 60661

LED Lighting Upgrade
Alteration
Results
Normal, IL 61761

Last Updated 09/13/2022 04:05 PM
Project Title

Energy Performance Contracting Project

Physical Address View project details and contacts
City, State (County) Smithton, IL 62285   (Saint Clair County)
Category(s) Single Trades
Sub-Category(s) Service/Term Contracts
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected November 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Questions or clarification may be directed to Superintendent, Dr. Courtney Castelli at 618-233-6863 or by email ccastelli@sccsd130.com Any contact of the Board of Education members during the RFP process and consideration of responding firms without approval of the Superintendent, Dr. Courtney Castelli, will be grounds for immediately disqualification of the firm. District reserves the right to reject any or all submissions, wholly or in part, to negotiate with any or all responsible submitters, and to waive any formality or irregularity in the Request for Proposal, to call for new submissions, to negotiate with any company providing a submission, to enter into agreement with the ESCO, and to accept the proposal that the District, in its sole discretion determines is in the best interest of the District, even though it may not be the lowest bid or proposal. Submitters shall be responsible for any and all expenses that they may incur in preparing qualifications. The District is interested in contracting for a full range of energy and water service and energy- related capital improvements at the Smithton Elementary School (hereinafter referred to as project). These services and improvements are to be delivered on a performance contracting basis with guaranteed savings in fully accordance and compliance with the provisions of School Code Article 19b, 105 ILCS 5/19b. The District's objective in issuing this Request for Proposals is to provide a competitive means in which to select a single provider to fulfill all aspects of this project. The District is interested in developing an infrastructure master plan and the Board may elect to implement further improvement measures in phases pursuant to the final contract. The work to be included in the contract may include upgrades to or replacement of equipment included in, but would not be limited to, the following systems: roofing, building envelope, infrastructure, windows, abatement, doors, insulation, weather stripping, caulking, security, flooring and sidewalks, electrical, lighting, heating, air conditioning, building automation, temperature control, construction and facility management, bathroom renovations including domestic water and sewer, energy recovery systems, or other energy conserving measures developed by the ESCO that provides long term operating cost reductions.

Details

Division 01 - General Requirements.
Division 10 - Specialties.
Division 11 - Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents