Similar Projects
Bally's Casino / Chicago
LEED Certification, New Construction, Infrastructure
Design
$1,700,000,000 CJ est. value
Chicago, IL 60654

London Crossing
New Construction, Infrastructure - 32,600 SF
Design
$11,000,000 CJ est. value
Wheeling, IL 60090

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Roadway Pavement Rehabilitation
Infrastructure
Post-Bid
Hoffman Estates, IL

2020 CDBG Street Improvements
Infrastructure
Post-Bid
Country Club Hills, IL

Burley ES - LBP Mitigation and ACM Patch & Repair in the Ventilation System
Term Contract, Infrastructure
Results
$29,725 CJ est. value
Chicago, IL 60657

Asphalt at Birch Park
Results
Hoffman Estates, IL 60169

Lincoln Yards South Package A-1 & B
Construction
Chicago, IL 60632

Auburn Park Station & Parking Facility
New Construction, Alteration - 4,678 SF
Construction
Chicago, IL 60620

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

State Street Mixed-Use Tower / Near North Side
Demolition, New Construction, Infrastructure - 10,000 SF
Pending Verification
$50,000,000 CJ est. value
Chicago, IL 60610

North Union - Phase 3 - 205 W Oak
New Construction, Infrastructure - 468,099 SF
Design
$95,000,000 CJ est. value
Chicago, IL 60610

Asphalt Parking Lot Removal & Replacement
Demolition, Alteration
Post-Bid
$300,000 est. value
Lansing, Tinley Park, IL 60438

McCook and Thornton Reservoirs Rock Wall Stabilization and Geotechnical Instrumentation
Renovation
Results
$8,460,000 to $10,250,000 est. value
Bedford Park, IL 60501

Lake Street Office
New Construction, Infrastructure - 67,600 SF
Construction
$16,600,000 CJ est. value
Chicago, IL 60607

Last Updated 12/28/2022 11:03 AM
Project Title

Rodenburg Road Improvements - Irving Park Road to Village Limits - Village of Schaumburg

Physical Address View project details and contacts
City, State (County) Schaumburg, IL 60193   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Design Development, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $4,791,456 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of pavement reconstruction of Rodenburg Road from Irving Park Road to the Village Limits. The Schaumburg Airport ROW runs along the east side of Rodenburg Road between Irving Park Road and the Metra railroad. The project will be designed and constructed with the Village of Roselle to continue the project from the Village Limits to Central Avenue. At grade railroad crossing improvements and a pedestrian crossing at the railroad will also be included in this project. Roadway widening will be required which was not included in the original project scope due to anticipated traffic increase and connection with the Metra access road. Coordination will be required with the Exterior development proposed on the west parcel of that project. As of December 28, 2022, this project is in the design phase and construction should start in 2023. This project is included in the Village of Schaumburg's FY 2022/23-2026/27 Budget CIP.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents