Similar Projects
Last Updated 12/16/2020 12:15 PM
Project Title

Mingus Mountain Communication Tower

Physical Address View project details and contacts
City, State (County) Yampai, AZ   (Yavapai County)
Category(s) Tower/Signal System
Sub-Category(s) Tower/Signal System
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $250,000 to $500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Mingus Mountain Communication Site Construction Project: project consists of furnishing all labor, supervision, materials, licenses, permits, insurance, transportation, and equipment necessary for: Properly removing and disposing of the existing Mingus Mountain Communication Building and all equipment, Removing existing waveguide bridge support and waveguide, removing and disposing of existing generator, relocating the existing 20-feet 6-inches by 11-feet 6-inches precast concrete communication building from ED5 substation in Arizona to Mingus Mountain, and anchoring it to the existing slab-on-ground. Performing all upgrades to the building as indicated in these specifications and on the Contract drawings to provide a complete building system, installing a new 13-feet 6-inches by 11-feet 6-inches Government-furnished precast concrete generator enclosure building and anchoring it to the existing slab-on-ground, providing and installing the building interface details that connect the two buildings together in accordance with these specifications and the Contract drawings, installing a new Government-furnished generator set and transfer switch in the generator enclosure building, providing galvanized steel entry platforms on concrete pads, providing mechanical and LP gas utilities and associated electrical and mechanical equipment, providing electrical utilities and associated electrical equipment, providing power distribution, lighting, grounding, and communications, installing waveguide bridge support and waveguide, moving the temporary communication building back to the DSW office once the other buildings are up and running.

Details

Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing.
Division 26 - Electrical.
Division 31 - Earthwork, Site Clearing.
Division 33 - Utilities, Site Grounding, Site Improvements Grounding, Tower Grounding, Site Lightning Protection, Communications Utilities, Communications Structures, Communications Transmission Towers.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents