Similar Projects
Budweiser Event Center Boiler Replacement - County of Larimer
Renovation
Conception
$530,000 CJ est. value
Loveland, CO 80538

Master Planning BEC Seating Replacement - County of Larimer
Renovation
Conception
$2,000,000 CJ est. value
Loveland, CO 80538

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

Sierra High School - New Football Stadium - Harrison School District Two
New Construction, Infrastructure
Design
$3,000,000 CJ est. value
Colorado Springs, CO 80916

RFQ Construction Manager - Adams County Multi-use Arena
Infrastructure - 90,000 SF
Bidding
$270,000,000 CJ est. value
Brighton, CO 80601

Surrey Ridge Horse Arena
Renovation
Post-Bid
$1,000,000 CJ est. value
Castle Rock, CO 80108

Equestrian Center and Parking Garage
LEED Certification, New Construction, Infrastructure - 1,361,440 SF
Post-Bid
$120,000,000 CJ est. value
Denver, CO 80202

Two Rivers Convention and Events Center
Addition, New Construction, Build-out, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Grand Junction, CO 81501

National Western Center - Phase 3-8 - The Triangle
New Construction, Infrastructure
Pending Verification
$160,000,000 CJ est. value
Denver, CO 80202

Master Planning BEC Suite Renovations - County of Larimer
Renovation
Conception
$975,000 CJ est. value
Loveland, CO 80538

Work and Cost Estimates for Hazardous Building Materials Abatement
Term Contract, Infrastructure
Design
Trinidad, CO 81082

The Triangle Project RFQ
Infrastructure, Renovation
Post-Bid
$528,000,000 CJ est. value
Denver, CO 80202

Sunset Amphitheater at Polaris Pointe
New Construction, Infrastructure
Pending Verification
$55,000,000 CJ est. value
Colorado Springs, CO 80907

Riverfront Trail Bank Stabilization-Ice Rink Phase II - City of Grand Junction
Renovation
Design
$400,000 CJ est. value
Grand Junction, CO 81505

Center For Community (C4C) - Office Suite Renovations
Renovation
Post-Bid
$190,000 CJ est. value
Boulder, CO 80305

Last Updated 12/27/2023 07:08 AM
Project Title

RFQ CM/GC - Vail Dobson Ice Arena Remodel

Physical Address View project details and contacts
City, State (County) Vail, CO 81657   (Eagle County)
Category(s) Entertainment/Recreation
Sub-Category(s) Stadium
Contracting Method Bids by Invitation, Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $1,250,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

https://www.vaildaily.com/news/can-vail-keep-the-dobson-remodel-within-its-55-million-budget/ The town of Vail is forging ahead with its plans to redevelop Dobson Ice Arena. At its Tuesday, Dec. 5 meeting, the Vail Town Council reviewed the project’s schematic design before sending it out to be priced by several general contractors. The Town Council reviewed the concept and programming for the upgrade in August, and the schematic design shows these concepts beginning to take shape. Dobson Ice Arena was built in 1979 and — outside of a few minor remodels over the years — has remained largely unchanged. The goal of the remodel is to bring some of the systems up-to-date, better meet the community’s current needs for the facility and ensure its longevity for the next 50 years. “We’re as excited as you are. I think this is something that’s been a long time coming for Vail,” said Mike Ortiz, the executive director of the Vail Recreation District, which operates Dobson. “You’re on the cusp of having something that will not only last for 40 years but raise the bar again, like Vail’s always done.” Funding for the numerous upgrades is expected to come from a few sources. First (and most significantly), is an anticipated $45 million from the Vail Reinvestment Authority Tax District — funds that must be spent by June 30, 2030. Additional funds are expected to come from the Vail Recreation District, the town’s general fund reserves and real estate transfer tax fund. In August, the Vail Town Council increased the budget from around $53 million to just over $55 million in an attempt to address all the needs with this remodel. “Let’s design the building that we need and then we’re going to figure it out,” said Travis Coggin at the July 18 Town Council meeting. “Whatever that number is, it’s important enough to us and if it’s designed right and it’s exciting enough, the money is there.” Even with the slight increase, staying within this $55 million budget could prove challenging. The town has brought on an owner’s representative — Chris Knight from Cumming Management — on the project to try and hold to this budget as best it can. With the current schematics, Greg Hall, the town’s public work director, relayed that while Knight feels “we’re really tight” on budget and “not as comfortable as we were on Aug. 1,” he can “still justify where he sees this project and the numbers we’re at.” However, even these numbers are from estimators, Hall acknowledged. Thus, the town’s next step will be handing the schematic designs over to several general contractors to price out the project in its entirety. “Contractors know the market, they know how it all goes together,” Hall said. “That’s why, at this early stage … we’re going out to the market to test where the estimate says we are and where the market says we are.” The town anticipates having pricing back in around six to seven weeks, after which time the town will have more information to push the design forward and stay on budget while it goes through the entitlement process. Staying within budget may mean compromising some of the design and program elements, but the town also intends to find sponsorship and donation opportunities where possible. “We do have a funding gap, but our goal is to go out and bring everything back together so the funding comes together with the project,” Hall said. What’s in the design? At a high level, the redesign of Dobson is meant to honor “the character and spirit of what Dobson is today, but totally modernize it,” said Patrick Gleason, with the project’s design firm Populous. Much of this is being done without expanding the facility’s current footprint too much. One of the most significant costs of the project will be a new roof on the structure. The current estimates for the roof are set at around $10.7 million. Currently, the roof is “somewhat reaching the end of its useful life,” said Gleason. Want the news to come to you? Get the top stories in your inbox every morning. Sign up here: VailDaily.com/newsletter In addition to its age, the current roof requires significant maintenance (primarily shoveling and snow clearing in the winter) and also does not meet current standards, code and rigging needs for event promoters, Gleason added. One of the challenges in the design is deciding what the new roof will look like internally. The design team has come up with two options: a steel roof and a hybrid between heavy timber and steel, which the design team feels “meets the spirit and intent of replicating Dobson today,” Gleason said. While the roof is set to be replaced in the Dobson remodel, what it will look like inside is still up in the air. Shown here in a schematic design from Populous is a hybrid steel and heavy timber design, which would seek to maintain the current feel of Dobson. Town of Vail, Populous/Courtesy Photo Both options are designed to fit within the rest of the schematics at this point and not change the outside design of the roof. The roof is expected to be five feet taller than it is currently in some places, Gleason said. The cost difference between these two options is somewhat of an unknown. So, as the project goes to general contractors, they have been asked to price both options, so that the town can make that decision in the future. Following the roof, the next most expensive cost is expected to be new mechanical, electrical and plumbing systems. These are estimated to cost just over $9 million as the current systems reach the end of their life. The current designs also include replacing the ice system and floor for the rink, which is estimated at just over $5 million. Gleason said the current plans include “bringing (the ice) up to effectively pro standards.” This cost is followed by a new south entrance and restrooms — estimated at around $4.9 million — and a new west entry — estimated at $915,000. These are designed to not only modernize the building and create new functional space but also with the west entry, to create more connectivity with Lionshead and the parking structure. Next, are new locker rooms and officials rooms — estimated at around $4.1 million — which, under the current designs will expand from four to six locker rooms and provide two locker rooms for officials. This, Gleason said, was to allow for gender equity and better serve the hockey community. There’s an estimated $2.2 million set aside in the budget for site work, which Gleason said will “enhance the surrounding site to some degree” without “going overboard.” The design has been completed to create new ticketing, seating and viewing opportunities. This includes an outdoor terrace on the south side, drink rail seating on the ice, a mezzanine deck on the south side overlooking the ice with fixed seats, lounge space and drink rail seating, as well as additional seating on the south side of the facility. As currently designed, the plans will increase the number of fixed seats from 729 to 1,106, increase the number of wheelchair and companion seats from between six to 16 to 20, and decrease the number of standing-room-only spots from around 562 to 394. For hockey games, this will jump the total seating from around 1,297 to 1,500 and concert seating from around 2,800 to 2,900. The designs also include additional “flex use” spaces, whose use will be determined by need and the recreation district in the future, as well as new restrooms, a new second-floor lounge and concession space and a new skate rental shop. “Right now, it’s a pretty utilitarian building, and we’re going to provide some things that allow for different places to sell, different experiences for people,” Gleason said. Temporary Ice Part of the Dobson budget includes a $1 million contribution from the town for a temporary sheet of ice as the remodel is underway. The town is anticipating that the construction will start in February 2025 and run through March 2027. Vail Recreation District is currently evaluating its options to continue some of its operations during these two years. Ortiz said that its best option is working with the county to utilize the indoor arena near the fairgrounds in Eagle. He added that the district has had conversations with the county to this end and is looking for partnership, not only with the county but with other communities in the valley as well. The Vail Recreation District intends to subsidize the operations of the temporary facility, but this is not without concerns, according to Ortiz. “We’re going to need to go somewhere that can house this for two years, but we’re going to need some help,” Ortiz said. “Frankly, I don’t think $1 million is going to do it, but we’re going to have to look at that … You’re making a commitment to the ice, we’re making a commitment to the subsidy — so we need more partners.” ------------------------------------------------------------------------------------------------------ The goal of the Dobson Ice Arena Remodel is to renovate and improve Dobson Arena so it can function efficiently while improving functionality and expanded services for the community. This includes: Replacing aging systems and infrastructure, Improving systems performance leading to significant reductions in energy costs, Adding Locker Room capacity to support program and equity among users, Enhance the user experience, Enable future expansion, Improve the landscape and hardscape around the arena with a particular focus on West Meadow Drive and the West Arena Entrance. The Project is located at 321 Lionshead Circle, Vail, Colorado. Question Deadline 10/25/2023 at 2:00 PM MT Submittal Contact & Questions Please direct all questions related to this request to contact below. All formal questions must be submitted in writing. Email: ghall@vail.gov. The Town of Vail has issued a Request for Proposals for CM/GC services on December 11, 2023 for the Dobson Ice Arena Remodel Project to a shortlisted group of general contractors. The general contractors were selected from responding contractors to an earlier Request for Qualification procurement issued on October 27, 2023. The shortlisted contractors and their respective contact information are: Mortensen Construction GE Johnson Construction Hyder Construction/McHugh Construction If you are interested in proposing on the project as a Subcontractor or Supplier, you must reach out to the shortlisted General Contractors and follow their process to qualify and propose on the project. The Town will not be responsible for ensuring that your proposals are received by the General Contractors.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Reinforcing, Concrete Finishing, Precast Concrete, Cast Decks and Underlayment, Concrete Cutting and Boring.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Decorative Metal.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Flooring, Painting and Coating, Special Coatings.
Division 10 - Specialties, Signage, Partitions, Toilet, Bath, and Laundry Accessories, Safety Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Parking Control Equipment, Pedestrian Control Equipment, Commercial Laundry and Dry Cleaning Equipment, Unit Kitchens, Office Equipment, Foodservice Equipment, Audio-Visual Equipment, Athletic and Recreational Equipment, Athletic Equipment, Interior Scoreboards, Play Field Equipment and Structures, Athletic Field Equipment, Exterior Scoreboards, Therapy Equipment.
Division 12 - Furnishings, Multiple Seating, Fixed Audience Seating, Stadium and Arena Seating.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Athletic and Recreational Special Construction, Fabricated Engineered Structures.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Facility Lightning Protection, Interior Lighting, Exterior Lighting, Lighting Poles and Standards, Exterior Athletic Lighting.
Division 27 - Communications, Audio-Video Communications.
Division 31 - Earthwork, Site Clearing, Earthwork Methods, Special Foundations and Load-Bearing Elements.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Athletic and Recreational Surfacing, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents