Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

I-78 Shrtlesville to Hamb - Resurface
Infrastructure
Conception
$17,670,487 CJ est. value
Bethel, PA 19547

RFQ Design - Architect/Engineering Services for the Design of CDC/NIOSH Consolidated Cincinnati Research Facilities, Cincinnati, OH
Demolition, New Construction, Infrastructure - 235,000 SF
Design
$100,000,000 CJ est. value
Cincinnati, OH 45206

PA 61 Restoration Phase 2A
Infrastructure
Design
$8,610,205 est. value
Reading, PA 19601

Green Hills Road over Allegheny Creek
Demolition, New Construction, Infrastructure
Bidding
$2,500,000 CJ est. value
Mohnton, PA 19540

SR 2023 over Antietam Creek
Demolition, New Construction, Infrastructure
Bidding
$5,000,000 CJ est. value
Wyomissing, PA 19610

Emergency Repairs to Water System and Emergency Repairs to Sanitary Sewer System
Term Contract
Post-Bid
Blandon, PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Post-Bid
$500,000 CJ est. value
Jacksonville, NC 28547

2021 Water Main Replacement
Results
Wyomissing, PA 19610

Harvey Avenue Water Main Replacement
Results
Less than $300,000 est. value
Reading, PA 19606

Brookdale Village
New Construction, Infrastructure
Pending Verification
$18,000,000 CJ est. value
Boyertown, PA 19512

I-78 Midway to Shartlesville Resurface
Infrastructure
Conception
$16,100,000 CJ est. value
Bethel, PA 19547

222 Hard Shoulder
Infrastructure
Design
$13,788,280 CJ est. value
Reading, PA 19607

BCRC Salt Shed and Jail Courtyard Paving Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Leesport, PA 19533

Glen Terrace Improvement Project
Infrastructure
Post-Bid
Mount Penn, PA 19606

Last Updated 08/08/2022 02:36 AM
Project Title

Sanitary Sewer Pipe Replacement at READING Air Traffic Control Tower

Physical Address View project details and contacts
City, State (County) Reading, PA 19605   (Berks County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $75,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

697DCK-22-R-00281 - Sanitary Pipe Replacement (RDG) READING Air Traffic Control Tower (ATCT), Reading PA. Mandatory Site Visit to be completed on July 13, 2022, at 11:00 AM (EST). Please confirm, NLT than COB July 11, 2022, the number of attendees from your organization attending the site visit so that the FAA can assign escorts. Please send a copy of your site attendees to both the Contract Specialist and Contracting Officer at the following emails: Contract Specialist: Carolyn H. Flynn Email: Carolyn.H.Flynn@faa.gov. Contracting Officer: Dylan. J. Huntley Email: Dylan.J.Huntley@faa.gov Milestones: Site Visit is confirmed for July 13, 2022, 11:00 AM (EST). Questions due NLT COB July 15, 2022. Estimated Project Magnitude is under $75,000.00. The offeror must e-mail any questions concerning sensitive technology to the Department of State at CISADA106@state.gov. The scope of this project is to replace a section of 4" sanitary sewer line for the bathroom of RDG ATCT. The 4" sanitary line will need to be replaced in the wet wall in the base building of the ATCT and then extend a new 4" cast iron pipe installed exterior to the building, below grade to the sewage lift station in the parking lot.In order to install the new sanitary pipe, the contactor will need to demolish the floor tile in the Men's Bathroom; saw cut and demolish a section of the floor slab in the Men's Bathroom, demolish a section of the tiled wet wall in the Men's Bathroom; core drill a new 6" hole in the foundation wall of the ATCT Base Building; excavate to the sewage lift station (core drilling a new hole into the lift station). After installation of the replacement sanitary main, the concrete floor in the Men's Bathroom shall be replaced and the wet wall in the bathroom shall be repaired. Provide a new ceramic tile floor and install new wall tile in the Men's Room. Reinstall the existing toilet and the existing urinal and sink. Provide new gaskets, wax seals and other hardware to reinstall the fixtures.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents