Similar Projects
Banner Gilbert Medical Center Parking Lots
Design
Gilbert, AZ 85234

System Preservation
Bidding
Less than $14,600,000 est. value
Avondale, Phoenix, Tolleson, AZ

Dynamite Boulevard - Pima Road to 136th Street Turn Bays and Bike Lanes
Infrastructure
Bidding
$800,000 to $1,200,000 est. value
Scottsdale, AZ 85268

Phase VII Pavement Replacement
Post-Bid
Guadalupe, AZ 85283

Update Pavement Management Program
Post-Bid
Cave Creek, AZ

Phoenix-Casa Grande Highway (I-10) 1-17 (Split) to SR 202L (Santan)
Results
Chandler, AZ 85225

Rittenhouse Road Bridge at Queen Creek Wash Improvements
Results
Queen Creek, AZ 85142

CarMax - Parking Lot
New Construction
Construction
Gilbert, AZ 85297

Riverpoint Parking Lot Addition
Addition
Construction
Phoenix, AZ 85040

Regional FFP IDIQ MATOC Roads, Bridges, Construction and Maintenance Sources Sought
Term Contract
Bidding
$1,000,000 to $10,000,000 est. value
Flagstaff, Prescott, Rio Verde, AZ - Albuquerque, NM 86301

Construction Manager at Risk Broadway Road (Phase 1) - Mesa Drive to Stapley Drive
Post-Bid
$25,000,000 to $30,000,000 est. value
Mesa, AZ 85210

Sun City Festival Ranch Planning Area 2 Parcel C2 Paving
Results
Buckeye, AZ 85326

Pave Dirt Road
Infrastructure
Bidding
Less than $1,200,000 est. value
Peoria, AZ 85345

Construction Firms to Provide Job Order Contract (Joc) Services
Post-Bid
Surprise, AZ 85374

New Facilities (Construction of New Roads)
Results
Less than $2,192,000 est. value
Maricopa, AZ 85138

Last Updated 06/02/2021 06:08 PM
Project Title

Miller Road/Hayden Road: Pinnacle Peak Parkway to Happy Valley Road

Physical Address View project details and contacts
City, State (County) Scottsdale, AZ   (Maricopa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $9,470,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The City of Scottsdale is seeking a qualified CMAR to provide construction preconstruction and onsite construction phase services for the City of Scottsdaleā€™s Miller Rd / Hayden Rd: Pinnacle Peak Pkwy to Happy Valley Rd Generally, this project will require cost estimating, provide value engineering, constructability reviews, design potholing and construction of but not limited to; 4 lane roadway with raised landscape medians, sidewalks and trails, construction of a bridge at rawhide wash, relocations of potable and non-potable water transmission mains, relocations of dry utilities drainage improvements, native plans salvage, landscaping and irrigation.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents