Similar Projects
Service Street
New Construction, Infrastructure
Conception
Thornton, CO 80023

RFP Engineering - Second Creek Farm and Oasis Parks, Trail Fitness Stations and Shade Structures
New Construction, Infrastructure
Conception
$2,000,000 CJ est. value
Commerce City, CO 80022

Butterfly Pavilion At Baseline
New Construction, Infrastructure - 81,000 SF
Design
$55,000,000 CJ est. value
Westminster, CO 80030

Residence Inn by Marriott / Broomfield
New Construction, Infrastructure - 25,149 SF
Design
$25,000,000 CJ est. value
Denver, CO 80234

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

RFP D/B - USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Design-Build Services I-70/Picadilly Interchange
Results
$37,000,000 to $43,000,000 est. value
Aurora, CO 80012

Construction of a Water Line Relocation
Infrastructure
Results
Aurora, CO

Riverdale Ridge High School CTE/STEM Center
New Construction, Infrastructure - 47,500 SF
Construction
$22,500,000 CJ est. value
Thornton, CO 80602

Patten Gray Apartments
New Construction, Infrastructure - 4,200 SF
Pending Verification
$90,000,000 CJ est. value
Denver, CO 80204

27J Schools 2021 Bond - Middle School #6
New Construction, Infrastructure
Pending Verification
$10,000,000 CJ est. value
Brighton, CO 80601

Fairfax Park Drainage Outlet Reconstruction - City of Commerce City
Infrastructure
Conception
$4,950,000 CJ est. value
Commerce City, CO 80022

Riverdale Regional Park Arena
New Construction, Infrastructure
Design
$20,000,000 CJ est. value
Brighton, CO 80601

Request for Contractor Prequalifications
Renovation, Infrastructure
Post-Bid
Thornton, CO

Asphalt Pavement Maintenance Contract
Term Contract
Results
$525,540 est. value

Last Updated 01/03/2024 07:31 AM
Project Title

East 62nd Avenue & Holly Street Improvements

Physical Address View project details and contacts
City, State (County) Commerce City, CO 80022   (Adams County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected January 2024
Bids Due View project details and contacts
Estimated Value $625,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000335865 This construction Project will develop concrete traffic calming bump out islands at all four corners of the E. 62nd Avenue and Holly Street intersection which will slow traffic and create a safer intersection for pedestrians, bicyclists and motorists. There are traffic calming, minor drainage and utility, pedestrian, striping and pavement improvements included with this Project. Striping improvements will extend from this intersection to E. 60th Avenue. Questions or comments regarding this RFB must be received in writing no later than 4:00 PM on Friday, December 08, 2023, by Mark Wallis at mwallis@c3gov.com. All Work must be completed within 90 calendar days of the issuance of a Notice to Proceed.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents