Similar Projects
USH 14 - Re/Reconditioning / Mill and Overlay
Infrastructure
Conception
$1,000,000 est. value
Evansville, WI 53536

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

Illinois State Line - Madison Incident Management
Infrastructure
Design
$4,000,000 CJ est. value
Janesville, WI 53546

City of Janesville, East Milwaukee Street, Atwood Avenue to Main Street City of Janesville, East Milwaukee Street, Atwood Avenue to Main Street
Infrastructure
Bidding
$3,000,000 CJ est. value
Janesville, WI 53545

City of Janesville, East Milwaukee Street, Atwood Avenue to Main Street City of Janesville, East Milwaukee Street, Atwood Avenue to Main Street
Infrastructure
Bidding
$3,000,000 CJ est. value
Janesville, WI 53545

Snow Plowing in Mallwood Estates
Term Contract, Infrastructure
Post-Bid
WI 53534

2021-2022 Snow Plowing Season
Term Contract
Post-Bid
Orfordville, WI 53576

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

2021 Crack Sealing
Infrastructure
Results
Beloit, WI

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Edgerton Apartments
New Construction, Infrastructure
Pending Verification
$16,000,000 CJ est. value
Edgerton, WI 53534

New Fire Station
New Construction, Infrastructure
Pending Verification
$4,400,000 CJ est. value
Milton, WI 53563

Water Quality Trading Clearinghouse
Infrastructure
Post-Bid

6th/North Street Turn Lane
Infrastructure
Results
Beloit, WI 53511

Last Updated 12/21/2022 07:10 AM
Project Title

2023 Utility Infrastructure Improvements

Physical Address View project details and contacts
City, State (County) Milton, WI 53563   (Rock County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Results, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $2,572,039 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Online Bidding: Available Est. Completion Date: Aug. 31, 2023 The proposed construction consists of two Parts. Part A includes approximately 3,300 feet of water main replacement including 760 feet of water services, fire hydrants, valves, and other appurtenances, 13,930 square yards of concrete pavement replacement, RRFB crosswalk modifications, landscaping, and other miscellaneous items of work. Part B includes replacement of an existing sewage lift station with a new submersible lift station including a precast concrete wet well, a precast concrete valve vault, electrical and controls, approximately 130 feet of sanitary sewer, 470 feet of open cut force main, 140 feet of jack and bored force main in a 24-inch casing pipe, 1,600 square yards of asphalt milling and surface replacement, restoration, and other miscellaneous items of work.

Details

Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents