Similar Projects
South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

South Clark Street Bridge Over Blackhawk Creek - FP004 - City of Davenport
Infrastructure
Conception
$770,000 CJ est. value
Davenport, IA 52802

Wayfind Sign Project
Infrastructure
Design
Davenport, IA 52801

Wayfind Sign Project
Infrastructure
Design
Davenport, IA 52801

Fairmount Community Center
New Construction, Infrastructure - 4,377 SF
Bidding
$2,200,000 CJ est. value
Davenport, IA 52804

3rd and Brady Streetscaping (Re-issue)
Infrastructure
Bidding
$462,461 CJ est. value
Davenport, IA 52801

Hillandale Road and North West Boulevard, 76th Street and North West Boulevard
Infrastructure
Post-Bid
Davenport, IA 52805

Main Street Landing - Destination Play Area and Event Lawn
Infrastructure
Post-Bid
$6,000,000 CJ est. value
Davenport, IA 52803

Wisconsin & 35th Street Improvements – HMA Surfacing And Trail
Infrastructure
Results
Le Claire, IA

CDBG Group 2 - Reconstruction East 7th Street (Iowa to LeClaire) and LeClaire Street (6th-8th)
Infrastructure
Results
Davenport, IA 52803

New Juvenile Detention Center - Scott County
Demolition, New Construction, Infrastructure
Pending Verification
$21,750,000 CJ est. value
Davenport, IA 52803

Middle Road Pedestrian Bridge - City of Bettendorf
New Construction, Infrastructure
Pending Verification
$2,000,000 CJ est. value
Bettendorf, IA 52722

Eastern Avenue Bridge at Goose Creek - FP005 - City of Davenport
Infrastructure
Conception
$440,000 CJ est. value
Davenport, IA 52807

PCC Patching
Infrastructure
Post-Bid
IA

31st and 32nd Street Speed Hump
Infrastructure
Results
Davenport, IA

Last Updated 02/23/2023 04:39 AM
Project Title

PCC Patching

Physical Address View project details and contacts
City, State (County) Davenport, IA 52806   (Scott County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Results, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $493,820 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Project Id : 230221 R1 County : Scott Projects Included: MP-022-6(710)89--76-82 ROUTE: IOWA 22 From Co Rd Y40 to IA 461 MP-061-6(725)107--76-82 ROUTE: U.S. 61 From WCL Blue Grass to Utah Ave in Davenport MP-061-6(726)122--76-82 ROUTE: U.S. 61 From S of I-80 to Co Rd F33 MP-067-6(721)33--76-23 ROUTE: U.S. 67 From Washington Blvd in Camanche to W Jct US 30 in Clinton MP-067-6(726)8--76-82 ROUTE: U.S. 67 From Valley Dr in Bettendorf to 8th St in Le Claire Estimated Value : $500,000 - $750,000 Unless otherwise specified, a bidder shall submit a proposal as per Article 1102.09 of the Standard Specifications. Proposals received after the bid deadline will not be read. Proposals containing any reservations not provided for in the forms furnished will be rejected. The Iowa DOT reserves the right to waive technicalities and reject any or all bids. Unless otherwise specified, a bidder must submit a proposal guaranty/bid bond with each bid as per Article 1102.11 of the Standard Specifications. Failure to execute a contract and file an acceptable performance bond and certificate of insurance within 30 days of the approval date for awarding the contract will be just and sufficient cause for the denial of the award and forfeiture of the proposal guaranty. The Iowa DOT (or other approved contracting authority) hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. Minimum wage rates for all federal-aid projects have been predetermined by the U.S. Secretary of Labor and are set forth in the specifications. However, this does not apply to projects off the federal-aid highway system. All federal-aid projects are subject to the Contract Work Hours Standards Act, as amended (title I of Pub. L. 87-581, Aug. 13, 1962, 75 Stat.357) and implementing regulations. IADOT - 207 - PCC Patching *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents