Similar Projects
Cooling Tower Replacement
Post-Bid
Less than $2,700,000 est. value
Boca Raton, FL 33431

Mechanical Renovations at Horizon Middle School & Kissimmee Middle School
Post-Bid
Less than $1,900,000 est. value
Kissimmee, FL 34746

Preventive Maintenance and Repair Services for Heating, Ventilation, Air Conditioning and Refrigeration Equipment - Chilled Water Systems and Secure Locations
Term Contract
Results
Kissimmee, FL 34741

J--Service: Replacement of Trailer Air Conditioner Units
Results
Gainesville, FL 326081135

HVAC Maintenance
Post-Bid
Jacksonville, FL 32203

PBSO District 3 - HVAC Replacement
Term Contract
Results
West Palm Beach, FL

Southport Middle School - Air Handling Retrofit Project
Post-Bid
Port Saint Lucie, FL 34952

J--GM-Vacuum Furnace Preventative Service
Results
Jacksonville, FL 32212

PBSO Real Time Crime Lab - HVAC Upgrades
Term Contract
Post-Bid
West Palm Beach, FL 33406

Hood and Duct Cleaning Service
Results
Hurlburt Field, FL 32544

Orange Park High School - HVAC Repair/Replacement Building 4 Gymnasium
Post-Bid
Orange Park, FL 32073

FDOT HVAC Install: Sneads WB Weigh Station
Results

S--Service: HVAC Air Duct Cleaning
Post-Bid
Bay Pines, FL 33744

HVAC Direct Digital Control System Service
Term Contract
Results
Less than $55,000 est. value
FL

Tampa Union Station RTU-7 AC Replacement
Post-Bid
Tampa, FL 33602

Last Updated 11/03/2020 01:38 PM
Project Title

Replacement of Four (4) Casa Fort HVACs

Physical Address View project details and contacts
City, State (County) Saint Augustine, FL 32084   (Saint Johns County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Replacement of four (4) Castillo De San Marcos HVAC units. : This contact is to replace 4 complete HVAC systems. One for the Interpretive Office (Unit 1), one for the Fee Office (Unit 2), one f ore the LE Office (Unit 3) and one for the multi-use employee office (Unit 4). The current systems have reached the end of their ser vice life. The Units to be installed will be highly efficient reducing energy use for the park.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents