Similar Projects
2023 Fourth Street Water Main Improvements
Infrastructure
Bidding
$600,000 CJ est. value
Watertown, WI 53094

Industrial Park Improvements
Infrastructure
Bidding
$900,000 CJ est. value
Ladysmith, WI 54848

Pressure Reducing Valve Repairs
Infrastructure
Sub-Bidding
$460,000 CJ est. value
Bayfield, WI 54814

District Wide Bottle Filler Stations - Bid Package 2
Alteration
Post-Bid
Milwaukee, WI 53228

Clarity Endcap Buildout
Renovation, Alteration
Post-Bid
Verona, WI 53593

Elevator Replacement, Roger Harring Stadium -MEP
Results
$675,000 est. value
La Crosse, WI 54601

Blackwell Job Corps Center Water Heater Replacement
Term Contract
Results
$25,000 to $100,000 est. value
Brodhead, Laona, WI 54541

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Steam and Condensate Repairs
Renovation
Construction
$169,500 CJ est. value
Waupun, WI 53963

Marinette Downtown Area Improvements
Infrastructure
Bidding
$5,500,000 CJ est. value
Marinette, WI 54143

ADA Plumbing Improvements
Alteration
Post-Bid
Wyocena, WI 53969

Plumbing and Steamfitter Services at WVH-UG
Term Contract
Results

Exterior Envelope Repair - Lathrop Hall and Van Vleck Hall
Renovation
Construction
$5,290,000 CJ est. value
Madison, WI 53706

KWU 2023 Water Main Relay Package #1
Infrastructure
Bidding
$300,000 CJ est. value
Kenosha, WI 53142

Private Property Inflow And Infiltration Reduction Residential Plumbing Contractors
Term Contract
Post-Bid
Milwaukee, WI

Last Updated 02/11/2023 02:05 AM
Project Title

Delafield Street And Lemira Avenue Utility And Street Improvements

Physical Address View project details and contacts
City, State (County) Waukesha, WI 53188   (Waukesha County)
Category(s) Single Trades
Sub-Category(s) Plumbing
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $7,570,829 [brand] Estimate
Plans Available from Civil Engineer - 01/20/23
Owner View project details and contacts
Architect View project details and contacts
Description

Pre-Qualification: Yes 3,660 Lin. Ft. of 12-Inch Water Main 1,440 Lin. Ft. of 8-Inch Water Main 8 Hydrant Installation 65 Water Service Connections 7960 Lin. Ft. of Sanitary Sewer Lining 87 Sanitary Sewer Lateral Rehabilitations 1380 Lin. Ft. of R.C.S.P Storm Sewer 57 New Storm Sewer Inlets 27,100 Sq. Yds. of Pavement Removal 15,000 Tons of Base Aggregate 11,000 Lin. Ft of Concrete Curb and Gutter 72,730 Sq. Ft of Walk and Approach 17,600 Sq. Yds. of 9-Inch Doweled Concrete Pavement (Base Bid) 3,700 Sq. Yds. of 8-Inch Concrete Pavement (Base Bid) 8,500 Tons of HMA Pavement (Alternate Bid) 29,000 Lin. Ft. of Pavement Markings 1 Temporary Traffic Signal 2 Full Traffic Signal Replacements The design of this project was completed by the owner's in-house design professional. A list of all subcontractors must be submitted and approved by the Director of Public Works one (1) calendar day prior to the Board of Public Works meeting scheduled to be held February 9, 2023

Details

Division 22 - Plumbing, Common Work Results for Plumbing.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents