Similar Projects
New Wastewater Treatment Plant
New Construction
Conception
Milton, FL

North Water Reclamation Facility Storage Expansion
Addition
Conception
$453,000 est. value
Palmetto, FL 34221

Northwest Wastewater Plant Operations Building
New Construction - 1,500 SF
Design
$8,000,000 to $10,000,000 est. value
Tampa, FL

Flagler Beach Wastewater Treatment Plant
New Construction
Design
Flagler Beach, FL

Ash Street WWTP Blower Installation Project
New Construction
Bidding
Orange Park, FL 32073

Marshall Street WRF Process Control Gate Repairs
Renovation
Bidding
$2,500,000 est. value
Clearwater, FL 33755

Wastewater Treatment Facility Filter No. 2 Replacement
Post-Bid
Less than $625,000 est. value
Port Saint Lucie, FL 34986

Wastewater Treatment Facility Improvements Phase 1
Post-Bid
Less than $4,900,000 est. value
Davenport, FL

Construction Management at Risk (CMAR) Services for the Nassau Water Reclamation Facility (WRF) Upgrade Projects
Results
Less than $550,000 est. value
Fernandina Beach, FL 32034

Northview High School - Wastewater Treatment Plant
Results
$600,000 est. value
Century, FL 32535

Greenland Water Reclamation Facility (WRF)
Construction
$100,000,000 est. value
Jacksonville, FL 32202

South Martin Regional Wastewater Treatment Plant Filter and Chlorine Contact Basin Improvements
Construction
Hobe Sound, FL 33455

Waste Water Treatment Facility Expansion
Addition
Pending Verification
Clermont, FL

Area 4 WWTP Filter Upgrades
Renovation
Bidding
Marathon, FL

East Digester Rehab at Wastewater Treatment Plant 3
Renovation
Post-Bid
$250,000 est. value
Winter Haven, FL 33884

Reported 04/22/2022 12:00 AM
Project Title

Stonecrest WWFT Rehabilitation

Physical Address View project details and contacts
City, State (County) Ocala, FL   (Marion County)
Category(s) Sewer and Water
Sub-Category(s) Sewage Treatment Plant
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $600,000
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

1. The existing WWTF consist of two (2) complete concentric circular tanks and the necessary division walls to insure process operation. The inner circular tank serves as the settling or clarifier basin and the annular space between the inner circular wall and outer circular wall is divided into the required process compartments. 2. This project includes the rehabilitation of the east plant only. The east plant is currently out of service and needs rehabilitation before being place back into service. The west plant is currently in operation and shall remain in operations for the duration of this project 3. Since the original installation of the WWTF, aluminum covers have been installed over the digester. Some components/trim pieces of the covers may need to be temporarily removed and reinstalled in order to perform the scope of this project.

Details

Sewage Treatment Plant, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents