Similar Projects
Buford Dam Road 12-Inch Water Line Improvements
Results
Cumming, GA

Fire Hydrant Field Testing
Term Contract, Infrastructure
Results
GA

Habersham Marina Water Line
Infrastructure
Results
$661,095 est. value
Cumming, GA 30041

Shady Grove Campground Water Line Improvements
Results
Cumming, GA 30041

FY 2021 Water Main Improvements
Infrastructure
Post-Bid
Gainesville, GA

Advanced Metering Infrastructure (AMI) Meters
Results
Cumming, GA 30040

Pilgrim Mill Road and Young Deer Drive Water System Improvements
Results
Cumming, GA 30128

Henderson Drive Waterline Extension
Infrastructure
Results
Cumming, GA 30041

Lead Free Water Parts
Term Contract
Results
GA

Bentley Road and Derby Drive Water Line Extensions
Results
GA 30040

Agriculture Meter Installation
Infrastructure
Results

Large Water Meter Testing
Term Contract
Results
GA

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Hammonds Crossing 16-Inch Water Main
Infrastructure
Results
Cumming, GA

Emergency Repair - Pipe Lining and Grout Chamonix Drive
Infrastructure
Results
Cumming, GA 30041

Last Updated 04/26/2022 05:15 AM
Project Title

Hurt Bridge And Keith Bridge Road Water Transmission Mains

Physical Address View project details and contacts
City, State (County) Cumming, GA   (Forsyth County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,728,682
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing all materials, equipment, and labor for the Construction of New Transmission Mains described as follows: Hurt Bridge CIP: approximately 3,905 feet of 36-inch diameter water main along Hurt Bridge Road and Keith Bridge CIP 2 and 3: approximately 15,402 feet of 36-inch diameter water main along Keith Bridge Road. Hurt Bridge Road ($2,037,684) and work on Keith Bridge Road ($6,690,998.00)

Details

Division 02 - Existing Conditions.
Division 03 - Concrete.
Division 31 - Earthwork.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 40 - Process Integration.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents